BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elk Grove, California. Completed plans call for site work for a water / sewer project.

Pre-Bid Meeting attendees must e-mail salamehr@sacsewer.com with attendee names no later than 24 hours prior to the meeting. This information is required to provide access at the facilities security gate. Background Information SacSewer (EchoWater) operates the EchoWater Resource Recovery Facility in Elk Grove, CA. EchoWater has a security entry gate at Dwight Road which is a perimeter access gate for the EchoWater Facility. This gate was completely damaged recently. The Dwight Road gate controls unauthorized people and vehicles from entering the facility outside the normal business hours which is a key for the security of the facility. Scope of Work Dwight Road Entrance Gate Replacement Project The project is to remove and dispose of the old gate, install a new gate that architecturally matches the existing exit gate design with a new HySecurity SlideDriver 30F Model 222 (480V, 3 phase, 60 Hz) or equivalent with aluminum drive rail and two new Gaze model number IGAZERSR66HD photo eyes (transmitter and receiver) or equivalent. The project should also include all new gate fabrication using a minimum 2"x4"x0.1875" tube steel frame with 2"x2"x0.1875" intermediate frame sections, Surface welds shall be ground smooth prior to hot dip galvanize the new gate. Six new infill panels shall be hot dip galvanized, three new 6" solid steel machined V-groove wheels, all hardware, and a new 4" x 4" inside gate receiver/roller post. The gate shall be fabricated in two sections and welded on site. All onsite welds shall be spray painted with hot dip galvanized paint. A traffic control Plan (i.e. Capital Barricade, Inc.) for Dwight Road for entering and exiting the Plant shall also be included in this project. The work to be completed in this RFB #8489 shall include all labor, equipment, materials and coordination of Traffic control. Question Due Date: November 19, 2024 by 3:00 PM Bidders are hereby notified that pursuant to Part 7, Chapter 1, Article 2, Section 1770, et seq., of the Labor Code of the State of California, the successful CONTRACTOR and its subcontractors shall pay their labor forces not less than the general prevailing rate of wages as determined by the Director of the Department of Industrial Relations, and travel and subsistence pay as such are defined in applicable collective bargaining agreements filed in accordance with Section 1773.8 of said Labor Code, for work needed and performed on this project. It shall, pursuant to the provisions of Section 1773.2 of said Labor Code, be a requirement of the work for the successful bidding contractor to post and maintain a copy of said wages' determinations at the project site throughout the duration of the work. SacSewer (EchoWater) hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, creed, color, national origin, ancestry, sexual orientation, political affiliations of beliefs, sex, age, physical handicap, medical condition, marital status or pregnancy as set forth hereunder. SacSewer (EchoWater) reserves the right to reject any or all bids and waive any irregularity in bids received. The project contact for this RFB is: Ramzi Salameh Project Engineer SacSewer (EchoWater) salamehr@sacsewer.com

Sub-Bidding

Water / Sewer

$65,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
75
Bidding Soon
1,873
All Active Projects
758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2024

December 23, 2024

img_map_placeholder

8521 Laguna Station Rd, Elk Grove, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.