BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 11, 2026

Site work for a mixed-use development in Milk River, Alberta. Completed plans call for site work for a playground / park / athletic field; road / highway; and water / sewer project.

WORK OF THIS CONTRACT .1 Work to be completed under this Contract includes, but is not limited to, supplying all materials, equipment, products, labour, transportation, and incidentals required for the Writing-on-Stone Provincial Park Septic Replacement and Regionalization Project. .2 Work of this Contract includes construction, commissioning, start-up, testing, training, restoration, and landscape maintenance for a new, fully functional wastewater system, including all associated infrastructure and incidental work required by the Contract Documents. .3 The wastewater system work includes, but is not limited to, the following: .1 Removal and decommissioning of the existing wastewater system as shown on the Drawings. .2 Installation of the wastewater collection system, including STEP tanks, manholes, pressure sewer, gravity sewer, cleanouts, valves, appurtenances, and related infrastructure. .3 Installation of the wastewater treatment system, including tanks, AX100 units, pumps, aerators, piping, valves, appurtenances, control panels, site electrical, and related infrastructure. .4 Installation of the wastewater disposal system, including dosing tank, dosing pumps, mound system, distribution piping, monitoring pipes, valves, valve boxes, geotextile, sand, distribution rock, topsoil, seeding, hydromulch, fencing, gate, and related appurtenances. .5 System start-up, testing, commissioning, operator training, and submission of required closeout documentation. .6 Site restoration, landscape maintenance, and all miscellaneous and incidental work required to complete the Work. .4 Physical Limits: Work of the Contract is not restricted to work within the Provincial Park boundary and includes all Work required by the Contract Documents. .5 The Work shall be carried out as shown on the Drawings and in accordance with the Alberta Private Sewage Systems Standard of Practice 2021, Alberta Forestry and Parks requirements, applicable regulatory requirements, applicable codes, authorities having jurisdiction, and the Contract Documents. Electrical work shall comply with the Canadian Electrical Code, Part I, CSA C22.1, and shall be acceptable to the electrical inspection authority having jurisdiction. .6 The Contractor shall coordinate construction activities, staging, access, ground disturbance, restoration, and environmental protection measures in accordance with the Environmental Construction and Operations Plan, historical resources requirements, and the Contract Documents. .7 Horizontal directional drilling/direct drilling shall be completed where indicated on the Drawings and in accordance with the Contract Documents, including the horizontal directional drilling notes shown on the Drawings and the reviewed Horizontal Directional Drilling Work Plan. Latitude/Longitude: 495'4.01"N, 11137'16.10"W Inquiry Deadline Date: September 2, 2026 at 2:00:59 p.m.

GC Bidding

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - State/Provincial

Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
12
Bidding Soon
146
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

November 11, 2026

Project location map

Multiple Locations, Milk River, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.