Published December 9, 2024 at 7:00 PM

Updated December 10, 2024

Site work for a mixed-use development in Macon, Georgia. Working plans call for site work for a transportation facility; and water / sewer project.

**As of December 9 , 2024 , this project has been cancelled but no definite date for the rebid.** Traffic Control Tower Access Road, Middle Georgia Regional Airport PROJECT DESCRIPTION Construction of access road to serve the future ATCT and commercial terminal consisting of approximately 900 tons of G-402 asphalt, 3,200 SY of graded aggregate base (6" thick), water and sanitary sewer lines, and associated appurtenances. A DBE participation goal of 9.79% and Davis-Bacon requirements will be included in the Contract. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. The successful bidder will be required to provide the Owner with the affidavit required by OCGA 36-91-21 (e) Competitive Award Requirements. Base Bid work under the contract shall be completed within ninety (90) calendar days from the issuance of the Construction Notice to Proceed. Liquidated damages for delays in completion will be in accordance with the following schedule: $1,000.00 per calendar day. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. Question Deadline 11/15/2024 All questions must be submitted in writing to Stan Price, P.E. at sprice@passero.com.

Final Planning

Transportation Terminals

$100,000.00

Public - City

Site Work

40

12

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
1
Bidding Soon
603
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

July 22, 2025

Project location map

1000 Terminal Dr, Macon, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.