BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and paving for a bridge / tunnel in Fort McMurray, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BF 77872-2 Carrying Hwy 63:12 over Poplar Creek, 19 KM North of Fort McMurray (Construction WAC0089185). The work proposed for the existing structure is intended to arrest or decrease the rate of deterioration in the structure, primarily the superstructure. The work may consist of, but is not limited to, overlay (partial or full) and installation of watertight deck joints. TIMELINE: Design is underway. Construction is tentatively planned for 2028. Project schedules may be confirmed in 2026. *Budget is unreleased.

Design

Bridges / Tunnels

$4,400,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
48
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2028

Project location map

AB-63, Fort McMurray, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.