BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Valdosta, Georgia. Completed plans call for site work for a road / highway; for the construction of a transportation facility; transportation facility; for paving for a transportation facility; and road / highway.

Project NO: GA 2201-49, 3-13-0115-045-2023, 10.2404, 24065, 100123057 The approximate extent and character of the work is generally described as follows: This project generally consists of construction of a new general aviation terminal building and landside sitework at the Valdosta Regional Airport. The Base Bid for the Project includes the general aviation terminal building, new entry roadway modifications, parking, utilities, fencing and other site improvements. The Base Bid will also include demolition of the existing General Aviation Terminal Building upon completion of the new building. There are two deductive alternates included. Last day for questions is December 12, 2024 by close of business. Questions of a technical nature should be directed to the Chris Lowery at (770) 285-8754 or transmitted electronically via email to clowery@holtconsultingco.com. Bid security in the form of a bid bond equal to 5% of the total bid is required. Bidders must submit bids for all Bid Items. Contract security in the form of 100% Performance and Payment Bonds will be required. No bid may be withdrawn after closing time for the receipt of proposals for a period of One Hundred Twenty (120) calendar days. Bidders shall inform themselves concerning Georgia Laws and comply with same. Construction contract time for General Aviation Terminal Building Project, if awarded will be completed as described below: The Base Bid work (General Aviation Terminal Building and Landside Sitework) is to be substantially completed within a maximum 420 consecutive calendar days from the commencement date specified in the written Notice to Proceed. The project will be constructed in multiple phases with traffic control and temporary construction measures required to maintain service to the existing terminal building while the new terminal building is being constructed. This project is funded under provision of the Airport and Airway Safety and Capacity Act of 1987. Certain mandatory Federal requirements apply to this solicitation and will be made a part of any contract awarded. (a) Davis Bacon Act (DOL Regulation 29 CFR Part 5) (b) Affirmative Action to Ensure Equal Employment Opportunity (Executive order 11246 and DOL Regulation 41 CFR Part 60) (c) Copeland Act, 29 CFR Part 3. (d) Contract Work Hours and Safety Standards Act. (e) Title VI of Civil Rights Act of 1964. (f) Disadvantaged Business Enterprises participation 49 CFR Part 26. The DBE participation goal is 6.77% for the Project. (g) Government wide Debarment and Suspension and Government wide Requirements for Drug-free Workplace (DOT Regulation 49 CFR Part 29) (h) Buy American Preferences (Title 49 United States Code, Chapter 501) (i) Foreign Trade Restriction: Denial of Public Works Contracts to Suppliers for Goods and Services of Countries that Deny Contracts to Suppliers of Goods and Services of Countries that Deny Procurement Market Access to U.S. Contractors (DOT Regulation 49 CFR Part 30) (j) Goals for Minority and Female Participation (41 CFR Part 60-4.2) (k) Certification of Nonsegregated Facilities (41 CFR Part 60-1.8) (l) Debarment, Suspension, Ineligibility and Voluntary Exclusion (49 CFR Part 29) (m) Bid guarantee of 5% (49 CFR Part 18.36(h)(1)) (n) Performance Bond of 100% (49 CFR Part 18.36(h)(2)) (o) Payment Bond of 100% (49 CFR Part 18.36(h)(3)) The Valdosta - Lowndes County Airport Authority reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests. ** Pre bid info : An informational non-mandatory pre-bid conference will be held via in person and Microsoft Teams Below is the link to attend the pre-bid virtually. While the pre-bid conference is non-mandatory, bidders and subs are encouraged to attend. Microsoft Teams meeting Join on your computer or mobile app.

GC Bidding

Transportation Terminals

$600,000.00

Public - County

New Construction, Paving, Site Work

171

31

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
13
Bidding Soon
364
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

img_map_placeholder

1750 Airport Rd, Valdosta, GA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.