Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Fort Collins, Colorado. Completed plans call for site work for a municipal facility; for paving for a municipal facility; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Work to be performed includes the construction of a new 20-acre municipal solid waste landfill cell, known as "Cell 1," featuring an engineered liner system. Additional work entails clearing and grubbing the site, constructing various components of the landfill cell, and ensuring proper grading and vegetation of disturbed areas. All bidders must submit a completed Contractor's Qualification Statement including a list of three (3) profile projects for each qualification item as proof of qualifications or your bid will be rejected. Work to be performed includes but is not limited to construction of a new 20-acre municipal solid waste landfill cell with an engineered liner system ("Cell 1"). The Work includes, but is not limited to, the following: 1. Mobilization and demobilization of all equipment, materials, and personnel required to complete the Work. 2. Contractor is responsible to supply any temporary power needed to complete the Work. 3. Construction water for dust control and moisture conditioning for compaction purposes onsite to be sourced by Contractor. 4. Attendance and participation of critical personnel at pre-construction meetings. 5. Attendance and participation at weekly construction meetings. 6. Development of a Material Handling Plan. The Plan shall be coordinated with the Owner. 7. Pulling and closeout of all permits, including associated fees, for all activities required to complete the Work, as required. 8. Installation, maintenance, and removal of erosion control measures. The Contractor shall be responsible for implementing necessary practices to mitigate erosion control and sediment transport issues in accordance with the Drawings and Landfill Stormwater Management Plan. The Contractor shall be responsible to notify the Owner if any erosion controls are damaged, regardless of the cause. The Contractor shall be responsible for obtaining coverage under the CDPHE General Permit for Stormwater Discharges Associated with Construction Activities, Permit Number COR400000 (General Permit). 9. Establish and stake Work area limits. 10. Using a surveyor licensed in the State of Colorado, establish ground controls; conduct initial site topography survey for required areas within the limits of the Work. 11. Protect any existing on-site utilities, pipes, and structures as shown in the Drawings or discovered during utility locates. 12. Clear and grub Work area. Limits of disturbance include approximately 30 acres. 13. Construct Cell 1 bottom of liner grades and sump to conform with control point plan. Construct perimeter berm. Install stormwater features. Conduct required material testing and survey once completed. 14. Construct 1-foot prepared subgrade of Cell 1 and excavate anchor trench. Conduct required material testing and survey once completed. 15. Install a geosynthetic clay liner (GCL), a 60-mil high density polyethylene (HDPE) geomembrane, and a drainage geocomposite. Conduct required material testing. 16. Install the protective cover layer, leachate collection piping, side riser piping, leachate cleanout piping, and gravel columns. Conduct required material testing. Survey once completed. 17. Install the leachate pump system, dual-contained forcemain piping, and leachate storage, 20,000 gallon frac tank. Conduct required material testing. 18. Construct access pad road and grading. Place base course on perimeter access road once construction operations become minimal for least disturbance. 19. Grade and seed all areas disturbed during construction outside of Cell 1 limits to promote positive drainage and establish vegetation. 20. Provide a final survey of the entire area of Work within the construction limits. 21. Repair any areas disturbed by the Work, clean up, and demobilize. 22. Contractor must coordinate daily operations with Contractor working on Infrastructure. Question Deadline 11/18/2024 at 4:00 PM MT All questions regarding this bid must be emailed to Purchasing Agent Christal Bateman, batemach@co.larimer.co.us, 970-498-5956
GC Bidding
Municipal
$711,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
January 6, 2025
To Be Determined, Fort Collins, CO
Related To This Project
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Nov 26 2024
Fort Collins, CO
Bid Date: Dec 02 2024
Fort Collins, CO
Bid Date: Nov 27 2024
Fort Collins, CO
Bid Date: Nov 22 2024
Fort Collins, CO
Bid Date: Dec 10 2024
Fort Collins, CO
Bid Date: Nov 28 2024
Fort Collins, CO
Bid Date: Dec 02 2024
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Oct 30 2024
Fort Collins, CO
Bid Date: Nov 13 2024
Fort Collins, CO
Bid Date: Dec 06 2024
Fort Collins, CO
Bid Date: Oct 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.