BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

Site work and new construction of a municipal facility in Drums, Pennsylvania. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of December 18, 2024, bids received were rejected and no definite date yet. Municipal Garage Building Project The bid of an individual must be signed by him personally, his signature must be witnessed; and his business address and any business trade name must be stated. The Bid of a partnership must state the names and addresses of all partners, and the partnership business name and address; and it must be signed by at least one partner, with the signature witnessed. The bid of a corporation must show the state of incorporation and the principal office address, and must be signed by the President or Vice President, with the corporate seal affixed, attested by the Secretary or Assistant Secretary. More than one (1) proposal or one (1) contract, from an individual, a firm or partnership, corporation, or an association under the same name or different names will not be considered. The Work related to the Butler Township Municipal Garage/Office Project comprises of the excavation for the proposed building pads; construction of footers; foundation; preparations for future utilities/conduit under concrete slab floor; electric, gas, water, drains, sinks, showers, restrooms, grease trap; exterior building shell construction, insulation, siding; windows, doors, roof trusses, steel roof panels, cupolas and lawn restoration; Eldorado stone veneer; per the plan elevations, workmanship and all appurtenances for a complete job and in accordance with these Contract Documents. This Project is being financed in part by a grant from the COVID-19 ARPA Local Fiscal Recovery Funding and general fund monies. PA Prevailing Wage rates apply to this project. Questions Due Date: Nov 15th 2024, 11:00 AM EST Time is of the essence. The Work must be substantially completed, signed, dated and approved on the Notice of Substantial Completion Form by the Engineer, Contractor and Owner within 120 calendar days after the commencement date stated in the Notice to Proceed. Liquidated damages will be assessed for each calendar day for failure of the Contractor to substantially complete the Work within the calendar days reserved for the Contract and/or for failure to sign and date the Notice of Substantial Completion Form. There shall be no pre-bid walk through of the Project Site.

Final Planning

Municipal

$355,000.00

Public - City

New Construction, Site Work

13

16

6

6

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
218
Bidding Soon
2,618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

June 18, 2025

Project location map

393 W Butler Dr, Drums, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.