BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and paving for a road / highway in Woodburn, Oregon. Design plans call for site work for a road / highway; and for paving for a road / highway.

The City's vision for an interconnected trail system through the Mill Creek Greenway corridor dates back to the 1960's, as properties were acquired and set aside for future development. The City furthered its plans with the completion of the Mill Creek Greenway Master Plan in 2006. The first phase of the system, completed in 2011, established an approximately one-mile multi-use trail running from Cleveland Street at the North to Deer Run Street at the south. The majority of the trail surface is asphalt, but it transitions to gravel in the natural area around Hermanson Pond, south of Wilson Street. Additional phases have been completed as residential development activity has occurred, such as the recent completion of the trail system through the Smith Creek housing developments to the west of Settlemier Park. In 2023, the City was awarded $1.7 million in funding from the Oregon Department of Transportation (ODOT) Oregon Community Paths Program. The ODOT funding is intended to complete five trail segments and an additional 1.3 miles of Mill Creek Greenway Trails on city-owned property. The priority of this project is to fill in missing links/segments of the existing trail system to existing trails and parks. This project is included in the City's 2025-2030 Capital Improvement Program (CIP). As of February 21, 2025, per owner, ODOT is “delivering” the project and will design and complete the project. Construction is not expected to start until 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
68
Bidding Soon
970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.