Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Lansing, Iowa. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://dailyreporter.com/2025/07/28/black-hawk-bridge-demolition-2025-replacement/ The Black Hawk Bridge between Iowa and Wisconsin will be torn down sooner than expected as a replacement bridge is underway for 2027. The Iowa Department on Transportation wanted to demolish the old Lansing Bridge, a 1,702-foot, cantilever bridge connecting Lansing, Iowa with western Wisconsin, by the time its replacement will be complete in two years. However, the department will close and demolish the bridge in fall 2025 to make way for its replacement less than 100 feet away on the Mississippi River. Known as the Black Hawk Bridge, the Lansing Bridge was completed in 1931 and connects Iowa Highway 9 and Wisconsin Highway 82 over the Mississippi River. The only other connections between Wisconsin and other states across the river are La Crosse and Prairie du Chien, which are roughly 60 miles apart. In 2023, Plain-based Kraemer North America started work on a 1,724-foot replacement bridge, which is underway alongside the existing bridge. Iowa’s DOT, the Wisconsin Department of Transportation and the contractor determined future construction stages could pose a risk to the safety of the existing bridge, officials said. An exact closure date hasn’t been announced yet. The existing bridge will remain open throughout the summer, but it saw two surprise closures in early 2024 and May 2025 after its piers shifted due to new construction. Replacement will cost a total of $140 million, officials said. Federal money will cover around 80% of the cost of the bridge and the states will split the remaining costs, officials added. The new steel through-truss bridge will include a 40-foot road width, a reinforced concrete deck and 150-foot foundations. The project team is searching for alternative river crossings for businesses and residents in Iowa and Wisconsin, such as restoring a water taxi service that was offered during previous closures. __________ On X42(Lansing Harpers Road), Over Village Creek, S18 T98N R03W County : Allamakee As of October 30 , 2025, the project is in Conceptual status. Anticipated letting Year is 2029. IADOT - Bridge Replacement on X42(Lansing Harpers Road) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$1,150,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
70
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2029

Project location map

Lansing Harpers Rd, Lansing, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.