BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mineral King, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This is an Invitation for Bid, Plan and Specifications Are Available Full and Open Competition With Hubzone Price Preference Project Number: Ca Ftnp Seki 13(2) Project Name: Mineral King Road Project Description: The Project Proposes to Rehabilitate Up to 12.09 Miles of Mineral King Road Located Within Sequoia and Kings Canyon National Park (Seki). The Project is Located East of Visalia in Tulare County, Ca. Scope of the Work: The Scope Includes Pulverization of the Existing Pavement, Aggregate Base Placement, and Asphalt Paving of the Roadway. Parking Lots Will Be Rehabilitated or Paved to Improve Visitor Access. Soldier Pile Walls, Soil Nail Walls, and Areas of Special Rock Embankment Will Be Constructed Throughout the Project to Stabilize the Roadway. The Project Also Includes Drainage Improvements Such as Ditch Paving and Grading, Inlet Installation, Culvert Replacement, and Inlet and Outlet Protection Measures. The Mineral King Road Project is in Remote Mountainous Terrain With Areas of Limited Roadway Bench Width. Public Access Will Have to Be Maintained During Construction With Intermittent Allowable Closures Depending on Season and Time. The Road is Inaccessible During Winter Due to Extreme Weather and Snowpack. The Project is in an Environmentally Sensitive Resource Area Within the National Park Service. Principal Work Items: 22,500 Lf Ditch Excavation 1,900 Cy Rip Rap 700 Cy Special Rock Embankment 6,500 Tons Roadway Aggregate, Method 2 7.5 Miles Full Depth Reclamation, Method 2 4.5 Miles Full Depth Reclamation, Method 2 With Cement 26,000 Tons Asphalt Pavement 380 Lf Steel H Piles, in Place 9,800 Lf 24" to 48" Culverts 70 Each Inlet (Concrete Box Inlet) 37,000 Lf Paved Ditch, Asphalt 80 Each Dry Stacked Headwall Anticipated Schedule: Preshow Onsite Meeting - October 2024 Advertisement - October 2024 Construction - April 2025 Through October 2027 Estimated Cost Range: $25m to $35m The price range of the project work is between $25,000,000 and $35,000,000. (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid. (b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds - (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted. (c) The amount of the bid guarantee shall be twenty (20%) percent of the bid price or $3,000,000.00, whichever is less. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$35,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
18
Bidding Soon
318
All Active Projects
138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

img_map_placeholder

To Be Determined, Mineral King, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.