BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Gilbert, Iowa. Completed plans call for the addition of a 21,200-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Construction of a 9,100 SF two-story classroom addition, a 12,100 SF gym and locker room addition, and renovation of four existing science classrooms at the Gilbert High School. Construction Contract: Multiple prime contracts will be issued for this scope of work. Design Professionals: CMBA, KED Bluestone, Bolton and Menk, Raker Rhodes Each material & labor and labor-only bid must be accompanied, in a separate envelope, by a bid bond for 5% of the bid amount or with a certified check or cashier's check. Performance and payment bonds in the amount of 100% of the contract amount will also be required, guaranteeing faithful performance of the Contractor. No bids may be withdrawn for a period of forty-five (45) days after the bid submission deadline. The Owner reserves the right to reject any and all bids and to waive informalities and irregularities. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of each successful Bidder for Material & Labor and Labor-Only work packages Successful bidders shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. The Gilbert Community School District reserves the right to conduct such investigations as it deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications, and financial ability of the Bidders, proposed subcontractors, and other organizations to perform the Work in accordance with the Contract Documents to the Owner's satisfaction within the prescribed time.

Post-Bid

Educational

$1,500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

90

32

42

5

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
38
Bidding Soon
614
All Active Projects
245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

img_map_placeholder

312 Gretten St, Gilbert, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.