BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a parking garage in Valparaiso, Indiana. Completed plans call for the renovation of a parking garage.

All work for the complete construction of the Project will be under one prime contract with the Owner based on bids received. The Engineer, American Structure point, Inc., will provide construction phase oversight of the Project. Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contract. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Porter County Board of Commissioners. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts. 2025 Base Scope Area of Work: i. Deck surfaces exposed to sky: Grid 7 at roof down to Grid 7 on north side of Level 3. ii. Traffic phasing/protection measures on Level 2 to accommodate Level 3 full depth and soffit work. Concrete Repairs: i. Precast double tee topping and full depth slab repairs, supplemental reinforcement where required by level of corrosion ii. Tee-tee connector repairs, construction phase Contractor/Engineer walkthrough 1. Full Depth - rebar 2. Carbon fiber biscuit d. Waterproofing work: i. Traffic coating at tee-tee joints and ends ii. Route and seal cracks iii. Cove sealants iv. Tee-tee Sealants e. Other work: i. Re-striping ii. Replace floor drains 1. Contractors should note that a double drain condition is present at the west end of Level 3. The associated PVC drain line is suspended from threaded rod hangers located within an overhead tee-tee joint. iii. Replace damaged barrier cables iv. The addendum will include a separate allowance for incidental mechanical and electrical work necessary to complete base scope items. f. Alternate Scope Items: i. Additional items if funds are available, may include additional work items in the current work area, or work downslope of Grid 7 on Level 3 Schedule- Mobilization Spring 2025, Final Completion End of 2025

Post-Bid

Parking Garage

$800,000.00

Public - County

Renovation

29

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
78
Bidding Soon
1,818
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

March 20, 2025

img_map_placeholder

155 Indiana Ave, Valparaiso, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.