EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 23, 2024 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a transportation facility in Fairhope, Alabama. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Site Directions: Traveling on US-98E turn left on Co Rd 32. Proceed for 0.8 miles and turn right on Edward Laird Way. Replace Taxiway Lighting System & Guidance Signs Fairhope Airport Authority Fairhope, Alabama Major items of work include the replacement of the taxiway lighting system and guidance signs at the H.L. "Sonny" Callahan Airport. Approximate quantities include: 1. Medium Intensity Taxiway Edge Lights 296 EA 2. Guidance Signs 31 EA 3. Removal of Existing Medium Intensity Lighting System 1 LS The project shall be completed within 150 Calendar Days of the Issuance of Notice to Proceed. Liquidated Damages for this project shall be $500.00 per Calendar Day. A Disadvantaged Business Enterprise (DBE) goal of 9.12% has been established for this project. The Owner's award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR \c26.53. As a condition of bid responsiveness, the Bidder or Offeror must submit the following information with their proposal on the forms provided herein: (1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract; (2) A description of the work that each DBE firm will perform; (3) The dollar amount of the participation of each DBE firm listed under (1) (4) Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under item (1) to meet the Owner's project goal; (5) If Bidder or Offeror cannot meet the advertised project DBE goal; evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR Part 26. Per 49 CFR Part 26.53(b)(3), the Bidder may submit evidence of a good faith effort within five (5) days after the bid opening. Guarantee will be required with each bid as follows: At least 5% of the amount of the bid, but in no event more than Ten Thousand Dollars ($10,000), shall be filed in the form of a certified check or bid bond payable to the Fairhope Airport Authority. Contract bond will be required as follows: 100% of the contract price. Labor and Materials Bond will be required as follows: 100% of the contract price. No bids will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified with the State of Alabama. In addition, non-residents of the State, if a corporation, shall show evidence of having qualified with the Secretary of State to do business in Alabama. No contract will be awarded unless the contractor holds a current and appropriate license from the State Licensing Board for General Contractors, Montgomery, Alabama. No bid shall be withdrawn for a period of 120 days subsequent to the opening of bids without the consent of the Owner. The right is reserved to reject any or all bids and waive informalities in the bidding. Question Deadline 11/20/2024 at 1:00 PM CT

Post-Bid

Transportation Terminals

$100,000.00

Public - Federal

Outdoor Lighting, Site Work

48

7

9

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Execution, Application, Erection, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Airfield Signaling and Control Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
33
Bidding Soon
459
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

December 23, 2024

img_map_placeholder

8600 Co Rd 32, Fairhope, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Taxiway Lighting System & Guidance Signs

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.