Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 28, 2025 at 7:00 PM
Updated October 1, 2024
Site work and outdoor lighting for a playground / park / athletic field in Washington, Michigan. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
The awarded contractor is RCI Electrical in the amount of $126,406.90. Reference Number 0000367885 Job Location: 6491 29 Mile Road, Washington, MI 48095 This project proposes to install 7 new light poles with fixtures and electrical conduit/wiring mounted with video surveillance cameras including all associated hardware, mounting brackets, cabling, software, associated support, warranty, and training for Gilcher-Crissman Park in Washington Township, MI. There is an existing electrical meter to connect to for electrical conduit/wiring going to light fixtures and cameras - location noted on lighting plan sheet. One (1) camera shall be mounted to each pole. Final direction will be determined with the awarded contractor. The bidder/contractor will provide all labor, materials and equipment to complete the project and will be responsible for verifying all measurements and information prior to starting work. The contractor is responsible for jobsite cleanup and for hauling any debris created as a result of the project to an approved disposal facility (assuming Type II Landfill) per the environmental documents dated April 20, 2002, July 22, 1999, October 17, 2002, and September 23, 2003 (attached). This site has been officially recognized as a "facility" in the attached environmental documents so no excavated material can be used offsite and there must be a one-foot clean topsoil cap above any contaminated fill. Question Deadline 12/02/2024 at 5:00 PM ET Questions are submitted online No, For any specific questions regarding this advertisement, please contact Brent Kraft, PE at 248-598-5178 or bkraft@giffelswebster.com Questions received after this time will not be answered. Prospective Bidders may obtain copies of the Bidding Documents from the Issuing Office as described below. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 50 % The Owner reserves the right to accept or reject any or all base or alternative Bid items of work, in whole or in part, and to waive any informalities, therein when such waiver is in the interest of the Owner, and to award the Contract to other than the low Bidder. Estimated range -$75,000-$100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Playgrounds / Parks / Athletic Fields
$126,406.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2024
April 15, 2025
6491 29 Mile Rd, Washington, MI
Related To This Project
Washington, MI
Bid Date: Jan 07 2025
Washington, MI
Bid Date: Jan 14 2025
Washington, MI
Bid Date: Feb 13 2025
Washington, MI
Bid Date: Feb 12 2025
Washington, MI
Bid Date: Feb 19 2025
Washington, MI
--
Washington, MI
Bid Date: Feb 20 2025
Washington, MI
Bid Date: Mar 11 2025
Washington, MI
Bid Date: Aug 15 2024
Washington, MI
Bid Date: Jul 12 2024
Washington, MI
Bid Date: Jun 20 2024
Washington, MI
Bid Date: Jun 13 2024
Washington, MI
Bid Date: May 21 2024
Washington, MI
Bid Date: May 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.