Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2024 at 7:00 PM
Updated December 23, 2024
Site work for a civil project in Shelton, Washington. Completed plans call for site work for a water / sewer project.
The project generally consists of the following: This Contract provides for the construction of approximately 22,250 LF of CIPP pipe lining of 8 and 10 main line sewers, open trench replacement of approximately 530 LF of 8 PVC sewer, construction of approximately 26,000 LF of 4 and 6 lateral CIPP lining, installation of approximately 425 sewer lateral cleanouts, rehabilitation of 35 manholes, construction of approximately 1,470 LF of 4 HDPE Force Main, a new 520 GPM sewage lift station, construction of 30 individual grinder pump stations for individual residences, approximately 1,700 LF of 4 gravity sewer service lateral, construction of approximately 6,000 LF of HPDE pressure side sewer service lateral by directional drilling, electrical improvements and all other related surface restoration and appurtenances for a complete and operating system. All work will be performed in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Two hundred fifty (250) working days will be allowed to complete the work. Each proposal must be submitted on the prescribed form and accompanied by cash, a certified check, cashiers check, or bid bond, payable to the Hartstene Pointe Water and Sewer District, in an amount not less than five percent (5%) of the amount bid. The successful bidder will be required to furnish a performance bond and payment bond, each in the full amount of the contract price. The District shall have the right to reject any or all bids not accompanied by bid security or data required by the bidding documents or a bid in any way incomplete or irregular *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$15,495,802.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
January 20, 2025
Multiple Locations, Shelton, WA
Related To This Project
Shelton, WA
Bid Date: Jan 14 2025
Shelton, WA
Bid Date: Jan 13 2025
Shelton, WA
--
Shelton, WA
Bid Date: Jan 24 2025
Shelton, WA
Bid Date: Mar 18 2025
Shelton, WA
--
Shelton, WA
--
Shelton, WA
--
Shelton, WA
Bid Date: Nov 06 2024
Shelton, WA
Bid Date: Oct 07 2024
Shelton, WA
Bid Date: Sep 24 2024
Shelton, WA
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
