BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Richland, Washington. Completed plans call for the renovation of a laboratory facility.

The 325 Radiochemical Processing Laboratory building (325RPL), a Hazard Category II nonreactor nuclear facility, is located at 325 Redwood Street, in the 300 Area on the Hanford Site. This work includes demolition of some of the existing concrete and repouring, fabrication of new railings and stairs, removing and reset stair treads on some of the others. All demolition debris will be loaded into ERDF cans, supplied by Battelle, for disposal at ERDF. Contractor shall furnish all labor, equipment, materials, supervision, and subcontracts necessary to repair the stairs and railings identified in 325RPL Stairwell Code Correction Modification Project S840759 drawings, bringing them up to current codes. Performance bonds - Unless BATTELLE determines that a lesser amount is adequate for the protection of the Laboratory and the Government, the penal amount of performance bonds must equal 100 percent of the original contract price; and If the contract price increases, an additional amount equal to 100 percent of the increase. Payment bonds - Unless BATTELLE makes a written determination supported by specific findings that a payment bond in this amount is impractical, the amount of the payment bond must equal - 100 percent of the original contract price; and If the contract price increases, an additional amount equal to 100 percent of the increase. Location: 325 Radiochemical Processing Laboratory (RPL), 325 Cypress Street, 300 Area, Richland, WA 99354 The Work shall commence within five (5) calendar days of Contractor's receipt of Notice to Proceed (NTP) unless the parties mutually agree otherwise in writing. Final Completion. No later than 5/16/2025 Question Deadline 11/22/2024 at 2:00 PM PT Inquiries: All inquiries shall be sent to: Melissa.newell@pnnl.gov. Bidder MUST submit a WRITTEN request for clarification or interpretation using Request for Information (RFI) form at electronically. Prime Contractor shall be pre-qualified prior to submitting bid; likewise, Subcontractors to a Prime Contractor performing work shall be prequalified prior to issuance of NTP.

Sub-Bidding

Laboratories

$100,000.00

Public - Federal

Renovation

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
8
Bidding Soon
134
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

January 2, 2025

img_map_placeholder

Multiple Locations, Richland, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.