Renovation of a road / highway in Yuba City, California. Completed plans call for the renovation of a road / highway.

The work to be done consists in general of installing approximately 3,000 linear feet of various sized gravity sewer main pipe, 14 sanitary sewer manholes, sewer stubs of various sizing, sewer lateral connection for existing homes future connections 5,500 linear feet of various sized sewer force main pipe, various valves and fittings associated with the sewer force main and new complete sanitary sewer lift station. ENGINEER'S ESTIMATE The estimated cost for this work is: $5,000,000.00 CONTRACT TIME The Contract Time for completion of all the Work of the Project is One Hundred Twenty (120) working days. WITHDRAWL OF PROPOSAL No bidder may withdraw his proposal for a period of forty-five (45) days after the date set for the opening thereof. Bids shall be valid for forty-five (45) calendar days after bid opening. NON-MANDATORY PRE-BID MEETING AND SITE WALK No Pre-bid meeting is scheduled. Contractor encouraged to perform a site walk prior to bid opening. LICENSING REQUIREMENTS Bidders and their proposed subcontractors shall hold such licenses as required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California Class A Contractor's License at the time the bid is submitted and throughout the contract term. The Contractor will also be required to ensure that all subcontractors working on this project are holding valid licenses suitable for their trade. DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS This project is subject to the Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246). The contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. DBE Good Faith Efforts: Contractor must ensure DBE's are made aware of contracting opportunities by posting solicitations for bids or proposals in a publication utilized by DBE's, before the bid opening date. DAVIS-BACON ACT This Project is subject to the Davis-Bacon Act and its provisions. CALIFORNIA LABOR CODE This Project is subject to the general prevailing rate of per diem wages as determined by the State of California Director of Industrial Relations as defined in Section 1773 of the Labor Code. The successful bidding Contractor and its subcontractors shall employ the appropriate number of apprentices, in each apprentice-able craft, on the project site as stipulated in California Labor Code Section 1777.5. Pursuant to California Labor Code Section 1771.4, this Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the State of California Director of Industrial Relations (DIR) pursuant to California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. No Contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to California Labor Code Section 1725.5. If awarded a contract, the Contractor and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. PAYMENT RETENTIONS; SUBSTITUTION OF SECURITIES A retention of five percent (5%) of the total value of the work completed to date will be made from the amount due on each progress payment for partial security for fulfillment of the contract. At the Contractor's request and at his expense, he may offer to substitute securities within the meaning of Section 22300 of the Public Contract Code in an amount equivalent to the amount withheld, to wit, bank or savings and loan certificates of deposit. This option is available to the Contractor as provided by Section 22300 of the Public Contract Code and must be initiated by him by request and at his sole cost and expense, and upon such request, City shall permit the substitution of securities equivalent to the amount withheld to ensure satisfactory completion and fulfillment of the contract. Contractor shall remain the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon during the period of retention. Such securities shall be released to Contractor upon satisfactory completion of the contract, to wit, thirty-five (35) days from and after the Notice of Completion. Questions deadline: 11/12/2024

Post-Bid

Roads / Highways

$5,000,000.00

Public - City

Renovation

33

8

26

2

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
41
Bidding Soon
766
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

Bogue Rd, Yuba City, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.