BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a mixed-use development in North Kansas City, Missouri. Completed plans call for the renovation of a educational facility.

The roof replacement project at Central Distribution Facility consists of the removal of the existing roof membrane (+/-16,320 square feet), providing specified roof insulation, modified bitumen roof system, and sheet metal work. The roof replacement project at Winnetonka High School consists of the removal of the existing roof system (+/-33,239 square feet), providing specified roof insulation, fully adhered single-ply roof system, and sheet metal work. The roof replacement project at Gateway 6th Grade Center consists of the removal of the existing roof membrane (+/-34,861 square feet), modified bitumen roof system, and sheet metal work. The roof replacement project at Chouteau Elementary School consists of the removal of the existing roof membrane (+/-7,194 square feet), providing specified roof insulation, modified bitumen roof system, fully adhered single-ply roof system, and sheet metal work. The NKCSD Board of Education reserves the right to reject any or all bids and reserve the right to be the sole judge of what it considers the lowest responsible bid. All bids are contingent upon available funding. The NKCSD is an Equal Opportunity Employer

Post-Bid

Educational

$100,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
39
Bidding Soon
723
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, North Kansas City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.