Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Dacula, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Work to be completed for this Project consists of furnishing all labor, materials, earthwork, construction operations, details, supervision, and coordination of all trades, utility suppliers, governmental inspections, and approvals to complete the construction, installation, and coordination for the City of Dacula "Brookton North Subdivision Asphalt Milling and Repaving Project" as follows: The scope of work includes asphalt deep patch milling, standard edge milling, and repaving of all streets within Brookton North Subdivision including Williams Farm Drive from Highway 316 into Brookton North Subdivision. All areas for deep patch milling are marked in orange paint by the Owner's representative. Contractor shall visit the streets identified and determine his own quantities for bidding the project. The project service area includes improvements for the entire length of Williams Farm Drive and interior streets within Brookton North Subdivision. Streets to be milled and repaved include Williams Farm Drive (3,259 LF +/-), Torrey Place (599 LF +/-), and Hannah Court (718 LF +/-) and all cul-de-sacs. All streets are approximately 23' wide +/- from edge of pavement to edge of pavement with 80' diameter cul-de-sacs. SPLOST and 2025 LMIG funds will be utilized for the scope of work to improve Brookton North Subdivision. Contractor is responsible for complying with all regulations and providing all documents as per City of Dacula requirements. An Asphalt Core Study for the subdivision has been completed and provided by Atlas Technical Consultants, LLC. to determine the existing asphalt and base thickness for milling depths. The paving scope will consist of deep patch milling and edge milling of the existing subdivision streets. Edge Milling will begin at 2-1/2" depth at gutter line and then taper out to zero towards the centerline of the road. Once edge milling is complete, the Contractor will perform an additional 4" of Deep Patch Milling to repair alligatored and deteriorated asphalt areas where marked by the Owner's Representative. Once milling is complete, deep patch milled areas will receive 4" of 25 mm Superpave Asphalt Binder Course to make flush with the remainder of the existing milled areas. An asphalt tack coat will then be applied over entire existing asphalt pavement prior to installing 1" inch of 'D' Mix Asphalt Binder Course. A second tack coat will be applied over entire surface prior to installing 1-1/2" of 'F' Mix (9.5 mm) Type 2 Asphalt Surface Course. All new pavement repair shall have smooth transition with adjacent existing asphalt intersections, curb & gutter, and driveways. Finally, new street signs shall be installed to replace aging and faded signage. The Centerline of the streets shall be built up to create a positive crown in roadway sloping out to edge of pavement and gutter to provide for adequate drainage of the streets. Limits of work include all asphalt pavement within right-of-way of City of Dacula for streets identified. Thermoplastic Stop Bar Striping shall be installed Hannah Court and Torrey Place intersections with Williams Farm Drive. Contractor shall install any other striping within the subdivision to match existing conditions. Any disturbance outside of existing streets to residential properties (lawns) shall be permanently stabilized with Sod grassing in kind or Bermuda. Contractor shall include in their Base Bid all costs for adjusting any sewer manholes, water valves, or other utilities, and for all materials needed to raise any valves or other covers flush within the finished surface of the road to complete the scope of work as described by the Contract Documents and Drawings. One lane of traffic and access to residential driveways must be maintained at all times. Traffic Safety devices such as signage, barricades, etc., and the protection of the public-atlarge, and the Contractor's personnel is part of this contract and is the Contractor's sole responsibility. The Contractor will have Sixty (60) consecutive calendar days from the "Notice to Proceed" to finish and complete the project. Owner reserves the right to waive any informalities and any technicalities, and to reject any or all bids. Question Deadline 12/12/2024 at 4:00 PM ET All areas of work illustrated on the Drawings are approximate and may not illustrate all items of repair and/or replacement. Contractor shall visit the site to observe, document, and measure all scope items marked in orange paint by the City and/or Owner's representative for preparing his own Bid for the project. Orange painted markings on the streets overrule what is illustrated on the Drawings if a discrepancy arises. Attention of Bidders is particularly called to the requirements regarding conditions of employment and minimum wage rates to be paid on this project, and that the contractor and subcontractor must comply with all Federal, State, and local requirements. Minority and female owned firms are encouraged to participate in this project. Procurement will be in compliance with the Uniform Administrative Requirements, 2 CFR 200.318-326. Potential respondents are particularly called to the requirements of Title VI; Civil Rights Act of 1964 and 24 CFR 570.602; and Executive Order 11246 - Equal Employment Opportunity and Affirmative Action.
GC Bidding
Roads / Highways
$800,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
January 20, 2025
Brookton Dr, Dacula, GA
Related To This Project
Dacula, GA
Bid Date: Dec 17 2024
Dacula, GA
Bid Date: Dec 10 2024
Dacula, GA
Bid Date: Nov 26 2024
Dacula, GA
Bid Date: Nov 07 2024
Dacula, GA
Bid Date: Oct 08 2024
Dacula, GA
Bid Date: Sep 06 2024
Dacula, GA
--
Dacula, GA
Bid Date: Aug 15 2024
Dacula, GA
Bid Date: Oct 09 2024
Dacula, GA
Bid Date: Jul 18 2024
Dacula, GA
Bid Date: Jul 18 2024
Dacula, GA
Bid Date: May 13 2024
Dacula, GA
Bid Date: Apr 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.