BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2024 at 7:00 PM

Updated December 11, 2024

Site work and paving for a mixed-use development in Foster Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

0.14 mi of hot mix asphalt fine texture pavement milling, resurfacing and reconstruction, concrete curb and gutter, signing and pavement markings for an offset right turn lane on M-55 at Rifle River Trail, Ogemaw County. Net classification required for this project is 211 Cb or 211 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No HSIP 65022 214062A 25A0094 MIDOT - 2412 047 - Hot Mix Asphalt Fine Texture Pavement Milling, Resurfacing and Reconstruction, Concrete Curb and Gutter, Signing and Pavement Markings on M-55 at Rifle River Trail

Bid Results

Roads / Highways

$179,209.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
1
Bidding Soon
257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 6, 2025

Project location map

M-55 & Rifle River Trail, Foster Township, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.