BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work for a water / sewer project in San Luis, Arizona. Working plans call for site work for a water / sewer project.

As of August 28, this project is in the preconstruction phase. A construction manager has been selected for the project. A firm timeline for construction has not been established. City of San Luis West WWTP 3 MGD MBR Phase 1 Upgrades Request for Proposals Headworks and Grit Removal System All interested equipment suppliers (referred to as manufacturers, vendors, or suppliers) shall provide a design and price proposal to be received for a Complete Headworks System for the City of San Luis, West Wastewater Treatment Plant MBR Phase 1 Upgrades project with a design capacity of 3.0 MGD MMADF in conformance with the following performance specification, No pre-proposal will be held. Any questions about obtaining documents can be forwarded to Andrea Jaycox at ajaycox@pacewater.com or (602) 502-9683. This request for proposal is for a complete packaged headworks system for the City of San Luis, West Wastewater Treatment Plant MBR Phase 1 Upgrades project with a design capacity of 3.0 MGD MMADF. The new headworks system shall be designed to provide screening and grit removal upgradient of a new MBR activated sludge treatment process. The combined headworks system will include a 6 mm fine screen, a grit vortex grit removal system, and a 2 mm fine screen. The system will be fully redundant in regards to all major components (i.e., there must be 2 separate trains each capable of treating the Phase 1 PHF). The screens will be used for removal of non-biodegradable particulates and fibrous material from the pumped influent flow. The screening system will include washing, dewatering, compacting, and automatic bagging of collected and dried screening materials. Water from the washing/dewatering/compactors will discharge back into the fine screen channel. Following the 6 mm fine screen, a grit removal system will be used for removal of grit particles from the influent flow prior to flow entering the downstream 2 mm MBR fine screen. The grit system will be complete with all required vortex devices, grit collection sump and pumping systems, and a grit classifying and dewatering system with an automatic/endless bagging system for disposal with a refuse bin. The grit classifying system will allow for water to discharge back into the fine screen channel. Each identical train shall be supplied with a separate prepackaged electrical instrumentation and PLC-based control system for automated control of each headworks component. The control system will communicate via Ethernet to a new WWTP master control panel. One equipment vendor will be pre-selected and will form the basis of the full-scale design that will be incorporated into the WWTP's MBR Phase 1 Upgrade plans. The modification design plans are scheduled to be completed before the summer of 2025. Construction is anticipated to be initiated within 6 months of design completion and approval. Due to the CMAR approach to this project, equipment procurement will begin soon after a vendor is chosen and prior to completion of the final design plans.

Pre-Construction/Negotiated

Water / Sewer

$1,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
11
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.