Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated November 11, 2025
Site work, paving and outdoor lighting for a civil project in San Luis, Arizona. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.
0000 YU SLS SZ01801C SLS-0(203)A CITY OF SAN LUIS CESAR CHAVEZ BOULEVARD: US 95 to SR 195 Cesar Chavez Boulevard; US95 to SR195 The proposed project is located in Yuma County within the City of San Luis along Cesar Chavez Blvd between Escondido Street to Avenue E. The work consists of reconstructing the roadway along Cesar Chavez Blvd to a four lane divided roadway intersection channelization at intersecting streets, drainage facilities, asphaltic concrete, signing, pavement marking, signals, lighting, and other related work. The project also includes a one-lane roundabout at the intersection of Cesar Chavez Blvd and Escondido St / San Luis Plaza Dr. SouthEast District Item # 100115 Engineering Specialist: Rene Teran Question Deadline 09/30/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in the Construction Phase of the contract will be 530 working days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 6.8 The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - System Enhancement (Engineering) - Cesar Chavez Blvd
Bid Results
Roads / Highways
$57,044,316.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
January 6, 2026
Cesar Chavez Blvd, San Luis, AZ
Related To This Project
San Luis, AZ
--
San Luis, AZ
Bid Date: Jan 27 2026
San Luis, AZ
Bid Date: Oct 06 2025
San Luis, AZ
Bid Date: Jun 24 2025
San Luis, AZ
Bid Date: Dec 17 2024
San Luis, AZ
Bid Date: Dec 12 2024
San Luis, AZ
--
San Luis, AZ
--
San Luis, AZ
--
San Luis, AZ
Bid Date: May 29 2024
San Luis, AZ
Bid Date: May 07 2024
San Luis, AZ
Bid Date: May 28 2024
San Luis, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
