EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2025 at 7:00 PM

Updated October 1, 2024

Remodeling of a theater / auditorium in Muskogee, Oklahoma. Completed plans call for the remodel of a 7,740-square-foot theater / auditorium.

furnishing all labor and materials and performing all work necessary for: Oklahoma Music Hall of Fame Remodel of Approximately 7,740 sf of Existing Building Bidders must bid on all items of the contract. The whole work under this contract will be awarded as a single contract to the lowest responsible bidder for the work. No bid may be withdrawn for at least forty five (45) days after the scheduled closing time for receipt of bids The cutoff for Bid Requests for Interpretation (RFI's) and Substitution Requests will be 12:00 (Noon) CST on December 3, 2024. All questions about the meaning or intent of the Contract documentsshall be submitted to Architect in writing no later than seven days prior to the time set for receipt of bids. Replies will be issued by Addenda mailed or delivered in digital format to all parties recorded by Architect as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Each proposal must be accompanied by a Bidder's Bond, or Cashier's Check upon any solvent Bank or Trust Company, payable without reserve to the City of Muskogee, Oklahoma, in an amount not less than five percent (5%) of the total amount of the bid. Bid security of the two low bidders will be retained until approval of contract and execution of satisfactory bonds by the successful bidder, or until other disposition on the bids is made. The bonds required will be a Payment Bond, a Performance Bond, each in the full amount of the contract. The City will not accept letters of credit in lieu of any bond required herein. The bidder (Proposer) must supply all the information required by the bid and proposal form including completion of affidavits or his bid will be considered incomplete and therefore rejected. The City may request of any bidder, before his bid is considered for award, that he submit a statement of facts as to his previous experience in performing work of the same character and magnitude, as to his business and technical organization, and financial resources and plant available and to be use in performing the contemplated work. Each bidder must have such information, together with a recent financial statement, available upon request. The City of Muskogee reserves the right to evaluate bids, to reject any or all bids, and to waive any informality in any bid.

Award

Theaters / Auditoriums

$3,547,338.00

Public - City

Remodeling

90

33

80

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Vapor Retarders
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Food Dispensing Equipment, Bar Equipment, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Dewatering, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
68
Bidding Soon
770
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

January 9, 2025

img_map_placeholder

401 S 3rd St, Muskogee, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Oklahoma Music Hall of Fame Remodel of Approximately 7,740 sf of Existing Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.