BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in Arvin, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Arvin High School: 5-Year Portables Demolition These portables will be a phased construction schedule. B14-20 will be first. Then B8-13, then B1-B7. The sequencing and timing of the project will determine how B21 to B35 are completed. Refer to construction schedule for timelines that must be met by each prime contractor or be subject to liquidated damages. Contractor shall account for any overtime or crew size increases to maintain the schedule. Contractor shall also assume they may be required to work on more than one phase at a time. 2. Provide rough grading for Portable B1-B13 and B21-27. Coordinate with concrete contractor for correct subgrade elevations and step locations. 3. Demolition of existing fencing not shown to be re-used. 4. Contractor will encounter existing underground utilities from previous portables. All existing conduits, boxes and irrigation mainline/control wire shall be removed as encountered during construction operations. 5. Contractor shall removal offsite all spoils not required for this project. For spoils required to backfill against foundations upon completion, coordinate the proper amount with the concrete contractor. The concrete contractor shall be responsible for backfill against new concrete foundations. 6. Coordinate with the District for the sequencing and schedule for disconnect and removal of existing portables. 7. There is an existing high voltage solar conduit and feeder running under these portables. Contractor shall pothole and hydro excavate the line at all important locations to ensure its protection. 8. There is an existing electrical feed from the electrical yard just south of new portable B2 that runs to the softball field scoreboard and an electrical box north of new portable B19. Coordinate with the district for its protection during construction. 9. Provide and install new storm drain system and drain structures per the design documents. 10. Provide and install new condensate and drywells as required for the portables. 11. Provide and install underground plumbing (water and drainage) for owner furnished contractor installed drinking fountain. 12. Disconnect and removal of water and waste from existing restroom. Reinstallation of water and waste to new restroom location utilizing waste and water from previous location Pursuant to Public Contract Code section 20111.6, prequalification of the prime contractor (bidder), and of its mechanical, electrical, and plumbing ("MEP") subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46), is required for the bidder to submit a bid on this project. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 180 Calendar Days Start/Delivery Date January 6, 2025 Liquidated Damages $3,500.00 per calendar day License Requirements C12, C36

Sub-Bidding

Educational

$400,000.00

Public - County

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
22
Bidding Soon
545
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.