EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 11, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a pre-engineered storage facility in Scranton, Pennsylvania. Completed plans call for the renovation of a pre-engineered storage facility.

**As of February 11,2025, project was awarded to D&M Construction , General Contract: Contract A – SSIS – D&M Construction $171,500 Contract B – WSH – D&M Construction $132,000 Total - $303,500 The Scranton School District is soliciting sealed bids for the South Scranton Intermediate School and West Scranton High School Fire Alarm System Replacements and Environmental Abatement (Project) in the form of MULTIPLE prime lump sum contract(s). Construction will be bid for the following Prime Contracts: Contract 1: General Construction Contract 2: Electrical Construction Contract 3: Environmental Abatement Contract A: South Scranton IS Fire Alarm System Replacement & Environmental Abatement Contract B: West Scranton HS Fire Alarm System Replacement & Environmental Abatement Checks shall be made payable to CHA and mailed to 1 E. Broad Street, Bethlehem, PA 18018. Bidders must supply the following information with their request for documents: the contract(s) you are bidding on, company name, contact person, complete address, phone and cellular numbers, and email address. Question Deadline 01/10/2025 All questions must be sent to: Ethan Fick (bfick@chasolutions.com) CHA All environmental abatement questions (Contract 3 questions) must be copied to: Rocco DiPietro (RDiPietro@pe

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$303,500.00

Public - City

Renovation

232

25

40

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Construction Aids, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 05 - Metals

Division 05 - Metals

Metal Decking, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
107
Bidding Soon
1,475
All Active Projects
705
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

February 17, 2025

img_map_placeholder

Multiple Locations, Scranton, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South Scranton Intermediate School and West Scranton High School Fire Alarm System Replacements and Environmental Abatement - Contract 1: General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.