EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 2, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a playground / park / athletic field in Worcester, Massachusetts. Completed plans call for the renovation of a playground / park / athletic field.

The Project Scope Generally Includes Interior and Exterior Renovations to Various Support Buildings Located at Vernon Hill Park. Wage Rates - Bids Are Subject to the Provisions of M.g.l., Chapter 149, Section 44a to J Inclusive, as Amended to Date, and Such Other Federal, State and Municipal Laws or Regulations. Attention of Bidders is Particularly Called to the Requirements as to Conditions of Employment to Be Observed and to the Fact That Not Less Than the Minimum Wage Rates Set Forth in the Contract Documents Shall Be Paid on This Project. Minimum Wage Rates Are Per M.g.l., Chapter 149, Sections 26 & 27 Inclusive. Grant/funding Requirementso All or a Portion of This Project May Be Funded Through the American Rescue Plan Act ("arpa") and the Coronavirus State and Local Fiscal Recovery Funds ("slfrf") (Collectively for This Paragraph, "arpa"). Successful Bidder is Responsible to Be Familiar and Comply With Arpa Requirements Applicable to Its Work Pursuant to the Contract, Including but Not Limited to Those Promulgated by the Department of the Treasury, Including 31 Cfr Part 35, 2 Cfr Part 200 ("uniform Guidance"), Including but Not Limited to 2 Cfr 200.327and 2 Cfr Part 200, Appendix Ii, and the Treasury's Administrative Guidance in the Form of Responses to Faqs. Without Limiting Such Responsibility, the Successful Bidder Shall Maintain Any and All Records Required to Document Its Compliance With Arpa Requirements and Shall Promptly Submit Such Records to Owner Upon Owner's Request. This Requirement Shall Survive Project Completion. Additionally, All Materials and Services Under This Bid/contract Must Comply With Buy American Requirements (E.g., 2 Cfr 200.322), Compliance With the Davis Bacon Act, Payments Bonds if the Project Value Exceeds $100,000 in Accordance With 2 Cfr 200.326. The Successful Bidder Shall Have a Current and Active Registration With Sam.gov and Shall Have an Active Federal Uei Number). Minority/women Business Enterprise Program - the City of Worcester Has Established Goals for the Participation of Minorities and Women Workers, Contractors, Subcontractors, and Suppliers on All City Projects. Bids Must Demonstrate the Contractor's Ability to Utilize Minorities and Women in All Phases of This Project. The City of Worcester Has Established a Program to Enhance Contract Opportunities to Minority and Women-owned Businesses Through Its Minority/women Business Enterprise Program. This Program Contains Minimum Participation Goals of Ten (10) Percent by Mbe's and Five (5) Percent by Wbe's Calculated as a Percentage of the Total Bid Price. Accordingly, All General Bidders and Filed Sub-bidders Must Execute and Submit With Their Respective Bids M/wbep Form Eoo-101, Contractor's and Filed Subcontractor's Certification. Responsible Employer Ordinance - the Performance of the Work Derived From This Bid is Subject to the City's Responsible Employer Ordinance, Chapter 2, Section 35 of Wro (2008). Accordingly, All General Bidders and Filed Sub-bidders Must Execute and Submit With Their Respective Bids Form Reo101 Page 2, Contractor's and Filed Subcontractor's Initial Certification. Noise Ordinance - All Contractors Must Adhere to the Provision of & 1a(E)(9) of Chapter Nine of the Revised Ordinances of the City by Limiting Their on-site, Noise Producing Construction and Related Work to the Hours Specified by Said Ordinance. Work Under Separate Contracts and by Owner - the Owner May Do Other Work During Construction With Its Own Forces or by Separate Contract. Commencement of Work and Time of Completion - the Selected General Bidder Must Agree to Commence Work Within Five (5) Days of the Execution of a General Contract and the Project Must Reach Substantial Completion by April 1, 2025. Arpa Funds Must Be Committed No Later Than December 31, 2024 and Expended No Later Than December 31, 2026. The Awarding Authority Reserves the Right to Waive Any Informality in, or to Reject Any or All General Bids, if It Were in the Public Interest to Do So. In Inviting Sub-bids in Connection With Such a Contract, the Awarding Authority Shall Reserve the Right to Reject Any Sub-bid on Any Sub-trade, if It Determines That Such Sub-bid Does Not Represent the Sub-bid of a Person Competent to Perform the Work as Specified, or That Less Than Three (3) Such Sub-bids Were Received and That the Prices Are Not Reasonable for Acceptance Without Further Competition. The City of Worcester is an Equal Opportunity/affirmative Action Employer. Documents Prepared by Weston & Sampson., for the Worcester Public Works and Parks, 50 Manny Familia Way, Worcester, MA 01609.

Bid Results

Playgrounds / Parks / Athletic Fields

$60,280.00

Public - City

Renovation

25

21

4

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Plastic Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
518
Active Projects
310
Bidding Soon
3,412
All Active Projects
1,540
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

December 31, 2024

img_map_placeholder

150 Vernon St, Worcester, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Vernon Hill Park Building Improvements - Sub Bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.