Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2024 at 7:00 PM
Updated December 10, 2024
Site work for a municipal facility in Boston, Massachusetts. Completed plans call for site work for a municipal facility.
As of December 9, 2024, this project has not yet been awarded. Project is usually takes a couple of weeks to award. A. Work covered by this contract includes but may not be limited to site-work; construction; re-construction; alterations; remodeling or repair of the public works Project described in this paragraph 1.03 including the following major work. Furnish all labor and materials necessary for the installation of the passive recreation space depicted in the drawings, including but not limited to cement concrete walk and plazas, stabilized stone dust area including installation of labyrinth template and unit pavers, permeable cobble and metal edging, dry well installation, recirculating water feature, custom fencing and site furnishings, etched stone pavement, piers, and markers, plantings, electrical and water connections. The project is adjacent to the existing Morton Station Village residential building located at 872 Morton St, Mattapan, which must remain accessible throughout the completion of this project Improvements to Odom Serenity Garden, Mattapan, MA Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Bid Results
Municipal
$369,998.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
January 6, 2025
Odom Serenity Garden,, Boston, MA
Related To This Project
Boston, MA
Bid Date: Nov 20 2024
Boston, MA
Bid Date: Nov 20 2024
Boston, MA
Bid Date: Feb 19 2025
Boston, MA
Bid Date: Feb 05 2025
Boston, MA
Bid Date: Dec 18 2024
Boston, MA
Bid Date: Dec 18 2024
Boston, MA
Bid Date: Dec 02 2024
Boston, MA
Bid Date: Jan 03 2025
Boston, MA
Bid Date: Dec 05 2024
Boston, MA
Bid Date: Jun 05 2025
Boston, MA
--
Boston, MA
Bid Date: Dec 03 2024
Boston, MA
Bid Date: Dec 20 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
