BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Renovation of a pre-engineered storage facility in Covington, Michigan. Completed plans call for the renovation of a pre-engineered storage facility.

Contract Award By Date: 02/04/2025 Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Curt Carlson at carlsonc7@michigan.gov no later than 2:00 p.m., Eastern on Monday, 12/9/24 The contractor shall furnish all labor, materials, equipment, and related services needed for the removal and replacement of the roof shingles, to include all applicable state building codes, manufacturer's recommendations, and industry standards. All necessary building permits through the state of Michigan, LARA/Bureau of construction codes. Buyer Name KRISTI ZAKRZEWSKI Buyer Email ZakrzewskiK@michigan.gov Buyer Phone 517-243-5669 PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS) Covington Salt Storage Building (SSB) Roof Replacement 13262 School Rd., Covington, MI 49919 All prospective bidder are to RSVP to Curt Carlson at carlsonc7@michigan.gov. Due to the chance of inclement weather, bidders are to be advised that any changes to the mandatory meeting date/time will be posted to SIGMA VSS no later than 72 hours prior to the date referenced above. LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. DESCRIPTION OF WORK: The contractor shall furnish all labor, materials, equipment, and related services needed for the removal and replacement of the roof shingles, to include all applicable state building codes, manufacturer's recommendations, and industry standards. All necessary building permits through the state of Michigan, LARA/Bureau of construction codes. Please NOTE: o Bid responses and bid attachments MUST be uploaded to SIGMA VSS. o Contractors should only submit a maximum of two (2) attachments (both being less than 25 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability) o Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response. o If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov o Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov). o You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. o Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible. o Bid Responses should not be emailed to the Project Director. 5% BID SECURITY REQUIRED ACCEPTING QUESTIONS UNTIL: Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Curt Carlson at carlsonc7@michigan.gov no later than 2:00 p.m., Eastern on Monday, 12/9/24.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$141,900.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

January 17, 2025

Project location map

13262 School Rd, Covington, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.