BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2025 at 7:00 PM

Updated February 8, 2025

Site work for a mixed-use development in Bainbridge Island, Washington. Completed plans call for site work for a communication facility; and water / sewer project.

All bid proposals must be on the form provided and must be accompanied by a bid surety in an amount equal to five percent (5%) of the amount of the bid proposal. A bid surety may be submitted as a cashier's check, postal money order, or surety bond. (The amount of the surety bond may be stated either as a dollar amount or as a percentage of the bid proposal.) Should the successful bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in this Project Manual, then the bid proposal deposit shall be forfeited to the City of Bainbridge Island. Additionally, this project is subject to the apprenticeship requirements of RCW39.04.320. NATURE OF IMPROVEMENT: The Contractor shall provide all labor, materials, tools, equipment, transportation, supplies, and incidentals necessary for the following major elements: The Contractor shall furnish and install nine (9) new pressure reducing stations, 132 individual pressure reducing valve assemblies, and approximately 5,800 linear feet of new water main, including an approximately 210 linear feet of 20-inch trenchless casing installation. This includes including all valves, appurtenances, connections to existing mains, water service replacement, power and communication conduits and cables, junction box, control panels and surface restorations. The work includes all materials, labor and services for a complete and operational installation. The City of Bainbridge Island reserves the right to reject any or all bids and to waive informalities in the bidding process. The contract will be awarded to the lowest responsible bidder. Bidders must meet the mandatory responsibility criteria required by RCW 39.04.350 and any supplemental criteria described in the Contract Documents. Bidders should verify they meet the responsibility criteria before submitting a bid. The City of Bainbridge Island is committed to a program of equal employment opportunity regardless of race, color, creed, sex, age, national origin, or the presence of any sensory, mental, or physical disability. Title VI Notice: The City of Bainbridge Island fully complies with Title VI of the Civil Rights Acts of 1964 and related statutes and regulations in all programs and activities. Americans with Disabilities Act (ADA) Notice: Individuals requiring reasonable accommodations may request written materials in alternate formats, sign language interpreters, and physical accessibility accommodations. For more information, contact the City Clerk's office at 206.842.2545 and/or cityclerk@bainbridgewa.gov. This project is partially funded through the Washington State Drinking Water State Revolving Fund Program with federal funds from the U.S. Environmental Protection Agency. Construction 10% MBE 6% WBE Supplies 8% MBE 4% WBE Equipment 8% MBE 4% WBE Purchased Services 10% MBE 4% WB Location of the work: Bainbridge Island Description of the work: The Contractor shall furnish and install nine (9) new pressure reducing stations, 132 individual pressure reducing valve assemblies, and approximately 5,800 linear feet of new water main, including an approximately 210 linear feet of 20-inch trenchless casing installation. This includes including all valves, appurtenances, connections to existing mains, water service replacement, power and communication conduits and cables, junction box, control panels and surface restorations. The work includes all materials, labor and services for a complete and operational installation. The Bidder agrees to complete the work as specified, including corrections, finish, and cleanup within one hundred seventy five (175) working days of the Notice to Proceed date given by the City of Bainbridge Island. The Contractor shall furnish and install nine (9) new pressure reducing stations, 132 individual pressure reducing valve assemblies, and approximately 5,800 linear feet of new water main, including an approximately 210 linear feet of 20-inch trenchless casing installation. This includes including all valves, appurtenances, connections to existing mains, water service replacement, power and communication conduits and cables, junction box, control panels and surface restorations. The work includes all materials, labor and services for a complete and operational installation.

Award

Communication

$6,026,955.00

Public - City

Site Work

62

9

4

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
85
Bidding Soon
1,720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

April 9, 2025

Project location map

To Be Determined, Bainbridge Island, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.