Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Renovation of a military facility in Hurlburt Field, Florida. Completed plans call for the renovation of a military facility.
18 Apr 2025 Amendment 0004 - Incorporate Addendum 001 which includes amended Drawings, amended Specifications, Site Visit Questions (RFIs) and Government Responses. Amendment 0004 also extends the Proposal Due date from 24 Apr 2025 to 2 May 2025 @ 1200 hrs CST. 24 Mar 2025 Amendment 0003 - Update Wage Determination 20250217 dated 14 Mar 2025 and Extend proposal due date to 24 Apr 2025. - 17 Mar 2025 Amendment 0002 - Add/Delete Deviation Clauses and Extend proposal due date. - 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts. This acquisition is a 100% Small Business Set-Side Attendees are advised of the requirement to submit all questions in writing to the Contracting office NLT five (5) business days following this site visit, currently 26 Feb 2025. All questions must be submitted in Word format. Only those questions asked and answered in writing will be considered binding to the Government. Email all questions to the POCs identified above. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$8,053,275.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2025
June 3, 2025
To Be Determined, Hurlburt Field, FL
Related To This Project
Hurlburt Field, FL
Bid Date: Dec 16 2024
Hurlburt Field, FL
Bid Date: Feb 28 2025
Hurlburt Field, FL
Bid Date: Jan 30 2025
Hurlburt Field, FL
Bid Date: Apr 01 2025
Hurlburt Field, FL
Bid Date: Mar 21 2025
Hurlburt Field, FL
Bid Date: Feb 18 2025
Hurlburt Field, FL
Bid Date: Feb 25 2025
Hurlburt Field, FL
Bid Date: Mar 24 2025
Hurlburt Field, FL
--
Hurlburt Field, FL
Bid Date: Dec 12 2024
Hurlburt Field, FL
Bid Date: Nov 18 2024
Hurlburt Field, FL
Bid Date: Aug 29 2024
Hurlburt Field, FL
Bid Date: Aug 26 2024
Hurlburt Field, FL
Bid Date: Sep 10 2024
Hurlburt Field, FL
Bid Date: Aug 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
