Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 2, 2025 at 7:00 PM
Updated March 3, 2025
Renovation of a military facility in Hurlburt Field, Florida. Completed plans call for the renovation of a military facility.
Question Deadline 02/12/2025 at 3:00 PM CT All communications shall be submitted via e-mail to all the following personnel/addresses: Ashley Williams at ashley.williams.85@us.af.mil, AND SrA Peyton Cole at peyton.cole@us.af.mil The Contractor must provide all personnel, labor, equipment, supplies, tools, materials, supervision, travel, periodic inspection, minor repair, and other items and services necessary to provide maintenance for Air Force vehicle barrier systems. Vehicle barrier systems include, but are not limited to, actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic-related equipment, safety loops and other vehicle detection systems, switches, corresponding traffic lights, light duty drop arms, associated computerized systems, and control cabinets. The purpose of the Vehicle Barriers (VB) Maintenance and Repair (M&R) Services Contract is to provide preventive maintenance (PM), inspection, and minor repair for operational vehicle barriers on Air Force, Air Force Reserve, and Air Force National Guard installations. Non operational vehicle barriers would be allowed to be put on the contract once brought to operational status (cured by means other than this contract). Use of this standard PWS will be mandatory for all Air Force installations who choose to perform Active Vehicle Barrier (AVB) maintenance by contract. Installation already performing AVB maintenance by contract must incorporate this standards PWS after their existing contract expires. Installation performing AVB maintenance using their Base Operating Services/Base Maintenance Contracts (BOS/BMC) must include this standard PWS within the scope of their BOS/BMC contract during the next recompete. Use of this PWS will not be mandatory but is optional for Air Force National Guard and Air Force Reserve installations. 1.2. DESCRIPTION OF SERVICES The Contractor must provide all personnel, labor, equipment, supplies, tools, materials, supervision, travel, periodic inspection, minor repair, and other items and services necessary to provide maintenance for Air Force vehicle barrier systems. Vehicle barrier systems include, but are not limited to, actuators, control systems (including software), control wiring, circuitry, structural framework, lighting, spring assembly, hydraulic related equipment, safety loops and other vehicle detection systems, switches, corresponding traffic lights, light duty drop arms, associated computerized systems, and control cabinets. Work must comply with all applicable commercial and United States (US) military standards and specifications as well as Federal, State, and local laws and regulations (see PWS Appendix C). It is the Contractor's responsibility to manage the execution of the Performance Work Statement (PWS) requirements in such a manner as to maintain equipment operational rates in accordance with (IAW) PWS Table 2: Service Summary, minimize equipment downtime, and minimize costs per performance requirements listed below. For the purpose of this contract, a barrier is defined as a crash rated system that operates as a single unit regardless of the number of lanes that the barrier restricts. Examples of a one (1) barrier unit include a single drop arm/raising bar regardless of the arm/bar length, a net barrier operated by a single actuator system regardless of the length of the net, a single wedge barrier operated by independent actuators, or a bank of bollards Not-to-Exceed (NTE) four (4) bollards that operate as a unit. additional site visit note: Contractor shall provide the company name, each person's name/phone number to SrA Peyton Cole at peyton.cole@us.af.mil and Ashley Williams at ashley.williams.85@us.af.mil and not later than 11:00AM CST on 03 February 2025 Hurlburt Field, FL has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. Please plan accordingly so that you obtain your visitor passes prior to the site visit time. Please bring the following documents to be processed in the visitor center: 1. Driver's license 2. Vehicle Registration 3. Proof of Auto Insurance
Post-Bid
Military
$900,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2025
March 31, 2025
To Be Determined, Hurlburt Field, FL
Related To This Project
Hurlburt Field, FL
Bid Date: Jan 30 2025
Hurlburt Field, FL
Bid Date: Apr 01 2025
Hurlburt Field, FL
Bid Date: Mar 21 2025
Hurlburt Field, FL
Bid Date: Feb 18 2025
Hurlburt Field, FL
Bid Date: Feb 25 2025
Hurlburt Field, FL
Bid Date: Mar 24 2025
Hurlburt Field, FL
Bid Date: Mar 24 2025
Hurlburt Field, FL
Bid Date: Mar 31 2025
Hurlburt Field, FL
Bid Date: Dec 16 2024
Hurlburt Field, FL
Bid Date: May 02 2025
Hurlburt Field, FL
--
Hurlburt Field, FL
Bid Date: Dec 12 2024
Hurlburt Field, FL
Bid Date: Nov 18 2024
Hurlburt Field, FL
Bid Date: Aug 29 2024
Hurlburt Field, FL
Bid Date: Aug 26 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
