Published June 22, 2025 at 8:00 PM

Updated June 23, 2025

Site work and paving for a mixed-use development in Wapato, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Lateral A intersection with a two lane roundabout, paving with hot mix asphalt pavement, installing truck apron and splitter islands with cement concrete, mountable cement concrete curb and gutters, shared use paths, illumination, delineation, landscaping, signing, traffic control and other work. 110 working days. Involves 84 items. Work class 4. County Yakima County Estimated value $7,000,000 - $8,000,000 A Federally funded contract with a 14% condition of award disadvantaged business enterprise goal. Bid opening meeting Join Team Meeting --->>>> Link in description or dial in +1 (206) 531-0324 Access Code 524-008-947# (available 10:30 a.m. on bid day - bids opened after 11:00 a.m.) WADOT - US 97, Lateral A Intersection - Intersection Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of Work This project involves constructing a multilane roundabout at the intersection of US 97 and Lateral A Road. Key components of the roundabout will include splitter islands, a central island, truck aprons, and appropriate delineation to guide traffic safely through the intersection. Drainage features will be an integral part of the roundabout design. Four new catch basins will be installed: two along the truck apron at the southwest corner and one at each end of the splitter island. Additionally, scuppered curb will be placed 1.5 feet off the edge line on the shoulder to slow down traffic entering the roundabout. The scuppers in the curb will allow runoff to pass through, where it will return to sheet flow across the seven-foot shoulder behind the curb and gravel spreader. A mountable curb will be installed along the splitter islands, truck aprons, and the center island. This curb has been analyzed for gutter flow and inlet spacing, with catch basins strategically placed to convey stormwater from the gutter to the biofiltration swale. Best Management Practices (BMPs) for stormwater management will include natural dispersion and a biofiltration swale. Stormwater will sheet flow off the shoulder, passing through the gravel spreader before naturally dispersing on the embankment slope. The biofiltration swale will collect stormwater via direct sheet flow runoff from the roadway and from catch basins collecting runoff from rolled curbing, ensuring proper stormwater management.

Bid Results

Roads / Highways

$4,985,320.00

Public - State/Provincial

Paving, Site Work

92

23

25

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
23
Bidding Soon
403
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

August 18, 2025

Project location map

US-97 & Lateral A Rd, Wapato, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.