Renovation of a military facility in Clearwater, Florida. Completed plans call for the renovation of a military facility.

This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 20150PR250000036 . Applicable North American Industry Classification Standard (NAICS) codes are: 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of materials and equipment b. Cost of labor Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 03 Dec 2024 Quotes are to be received no later than close of business (3 p.m.) on 21 Nov 2024 and are to be sent via e-mail to angel.melendez@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Angel Melendez 909 SE 1st Ave, Room 512 Miami, FL 33131. Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in FEDBIZOPS (www.fbo.gov). Wage determinations: FL20240184 01/05/2024 SCOPE OF WORK: Scope of Work For USCG Air Station Clearwater (ASCW) Electrical Transformers Replacement October 24, 2024 Facilities Engineering Air Station Clearwater 15100 Rescue Way Clearwater, FL 33762 General: United States Coast Guard Air Station Clearwater is accepting proposals for qualified individuals to demolish, prepare, and install new electrical transformers destroyed by Hurricane Helene. Work includes furnishing all labor, trades, equipment, components, materials, tools, and supervision. Further items listed below are intended to clarify the statement of work (SOW), indicate general arrangement of the system, and alert the contractor of existing conditions. The contractor shall report any inconsistency or apparent conflicts in the work being proposed. Recommendations or modifications may be considered, but only upon Contracting Officer review and approval. Prior to submitting a quote, it is mandatory to examine the scope of work and it is highly recommended to visit the facility to take field measurements, conduct any necessary evaluations and become familiar with existing conditions under which the work will be performed. After the award of the contract, an on-site meeting will be held prior to starting the work. Location: United States Coast Guard Air Station Clearwater 15100 Rescue Way Clearwater, FL 33762 1. Continuity of Facilities Operation: Schedule work to minimize interference with the facility operations and during the normal operating hours of 7:00 am to 3:00 pm Monday thru Friday, excluding federal holidays. Work may be conducted during other hours if approved in advance by coordinating with the facility Point of Contacts (POC) listed below. 2. Notification of Start and Completion of Work: The Contractor shall provide a simple and general schedule of work. For example, "Begin work at ____ on _______. Work is expected to last __ days and be complete on _______." 3. Coast Guard Points of Contact: The Contractor shall coordinate with the following personnel to arrange access the facility. POC's are listed in order of preference. Name Email / notes Phone Number CWO Will Stevenson William.K.Stevenson@uscg.mil 727-423-7586 (cell phone) 727-535-1437 x1572 MKC Mike Hemmingway Jonathan.M.Hemmingway@uscg.mil 727-535-1437 x1573 Engineer of the Watch Duty watch-stander (24/7 available) 727-423-2130 (cell phone) 4. Recycling and Disposal of Refuse: Minor refuse and waste materials resulting from operations may be disposed of in Air Station Clearwater dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. No Hazardous Waste or bulk waste may be disposed of in Air Station Clearwater dumpsters. 5. Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA State and Federal regulations. Immediate notification to the Contracting Officer's Representative of lost time due to accidents is required. Provide two copies of workman's compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. 6. Inspection: The Contracting Officer's Representative has the right to reject defective workmanship or materials or work not performed as per the contract specifications. 7. Operations and Storage: The Coast Guard has no responsibility for receipt, storage, or protection of contractor's materials. The Coast Guard will not accept shipments and no materials may be stored on site by the contractor. The contractor is responsible for the protection of existing structures, utilities and vegetation. Any damage shall be repaired at the contractor's expense. 8. Existing Utilities: Contractor is authorized to use Air Station Clearwater power and water while conducting the work efforts outlined in this document. Any other use of power in not authorized. 9. General Regulations while onboard Coast Guard Air Station Clearwater: 1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events. 2. Contractors are welcome to eat breakfast & lunch on Base in the base galley at published meal rates. Breakfast is served from 0600-0730 daily & lunch will be served from 1100-1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty. 3. Contractors are welcome to utilize the Base's Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it. 4. Traffic Regulations: a. 10 mph speed limit b. No use of cell phones is permitted while driving vehicles or operating heavy machinery. c. All personnel shall obey all marked traffic signals including stop signs & stoplights. 5. Notice shall be given to the Coast Guard's representative 1 week in advance of any planned outages, including any pool closure and expected duration. 6. Contractors are welcome to utilize the restrooms in the area they are currently working in providing they are clean and do not track mud, dirt or any other debris into the restrooms. 7. No personnel other than the Contracting Officer has the authority to alter the terms of any contract or to issue any change orders. Accordingly, the contractor shall not complete any work that would incur additional cost to the government without written approval from the Contracting Officer. 10. SECURITY REQUIREMENTS: 1. The contractor shall provide a consolidated list of all contractor personnel who will be working on Air Station Clearwater Facilities at least 1 week prior to work. This is for routine/ standard background checks of all personnel entering the base. Information required is: full name, date of birth, and last 4 digits only of Social Security Number. 2. Only American citizens and permanent resident aliens are allowed onboard Air Station Clearwater Facilities. Absolutely no foreign nationals are permitted on the premises. Appropriate identification shall be provided at the front gate to attain base entry. 3. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractor is subject to orders to evacuate the property at any time. 4. Absolutely no firearms or weapons of any kind are allowed onboard Air Station Clearwater. 5. The contractor and subcontractor personnel shall at all times wear company identification and carry photo identification on their person. 11. SCOPE OF WORK: A site visit will be provided upon request and is highly recommended prior to providing a bid for this work; contact the Contracting Officer with any questions or for further detail. Contractor shall provide all labor, trades, equipment, components, materials, tools, and supervision necessary to demolish, prepare space and utilities, and install new transformers in the following locations. All work completed shall be in accordance with industry and manufacture standards. a. RWH Metal Shop x2 b. RWH NW Electrical Room c. RWH SW Electrical Room d. Corrosion Control Building e. RWH Tool Shop 1. Electrically isolate equipment through lock out tag out process. 2. Disconnect and remove old equipment from power source. 3. Raise all necessary electrical components 3' in height. 4. Install new electrical transformers with-in manufacture instruction. 5. Verify electrical wiring is in good condition. 6. Conduct testing of new equipment with ASCW personnel present, must achieve satisfactory outcome. 7. Dispose of old equipment and debris. 8. Work area must be cleaned daily of all debris preventing FOB for aircraft. 12. ACCEPTANCE OF WORK: When the contractor has completed all work, they shall notify the Coast Guard (COR) for a final inspection. If the work is accepted, the contractor shall submit final invoice to the Coast Guard as directed by the COR. ENCLOSURES: (1) N/A -- End of Section -- Performance Period: Performance of work is expected to commence NLT 10 days after award is made. Extension period must be approved by the Contracting Officer for any unforeseen delays. Site visit: It is highly recommended and encouraged that interested party's contact CWO William Stevenson for a site visit which will be held on Tuesday NOV 12, 2024 at 08:00AM EST. For scheduling contact Mr. Stevenson via email william.k.stevenson@uscg.mil Or via phone at 727-535-1437 x1572. **All Questions and Answers will not be accepted after 18 Nov 2024 at 10:00AM EST. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an "ACTIVE" status prior to award.

Post-Bid

Military

$80,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
48
Bidding Soon
904
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

img_map_placeholder

15100 Rescue Way, Clearwater, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.