BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Honea Path, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Demolition of surface wash sweeps, replacement of filter media with addition of GAC, installation of new air scour system with blower and control modifications, replacement of electric valve actuators, and related piping instrumentation and electrical work for existing four filters at 3.87 MGD water treatment plant. This project is being funded by a loan from the State Revolving Fund (SRF) and bidders must comply with all applicable state and federal requirements identified in the bid documents, including Davis-Bacon and "American Iron and Steel"(AIS) provisions. Bidders must implement procedures that ensure that Disadvantaged Business Enterprise (DBE) firms are given opportunities for meaningful participation. Additional information can be found in SRF Appendix A located within the specifications. BABA is not required for this project. The work will consist of improvements to the existing filters at the 3.87 MGD water treatment plant (WTP) as follows: 1. Demolition of the existing surface wash sweeps and filter media in Filter No. 1, 2, 3 and 4. 2. Installation of an air scour system, including one blower and controls, air piping and valves, air scour piping and diffusers in each filter, and filter console modifications. 3. Installation of new filter media in each filter, including support gravel, silica sand, anthracite, and granular activated carbon. 4. Removal and replacement of electric actuators for existing valves in the Filter Gallery (Alternate No. 1). 5. All related process piping, instrumentation, electrical equipment and wiring. Question Deadline 12/11/2024 All questions about the meaning or intent of the bidding documents are to be directed to the Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered electronically to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. O

GC Bidding

Water / Sewer

$2,500,000.00

Public - County

Renovation, Site Work

14

20

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
45
Bidding Soon
676
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2024

January 15, 2025

img_map_placeholder

525 Filter Plant Rd, Honea Path, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.