BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2024 at 7:00 PM

Updated November 30, 2024

Site work and new construction of an educational facility in Berkeley, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Scope of Transit Hub and Utilities Project & SSM B - New Facility Welcome Center bid includes but is not limited to The Final Cleaning as described in specification 01 77 00. Including cleaning of all building exterior and interior hard-surfaced finishes to a dirt-free condition free of stains, films, and similar foreign substances leaving project fully clean and ready for occupancy; clean all rooms of every type complete; full wipe down of all finishes exterior and interior; clean and sanitize all restrooms, toilet rooms, and kitchens complete, including toilets, sinks, lavatories, showers, plumbing fixtures, kitchen accessories and equipment, stainless steel surfaces, walls, and floors; clean casework, cabinets, drawers, exteriors and interiors, and countertops complete; clean exposed mechanical ducts, electrical and plumbing pipes, support systems, equipment, insulated systems, registers and louvers, and unfinished or exposed ceilings; clean floors, vacuum carpets and similar soft surfaces (according to manufacturer's recommendations) and wipe baseboards; wash interior and exterior windows, frames, glazing, and partition glass; cleaning of the top of solar fins at window exteriors; remove and legally recycle or dispose of all cleaning debris from the site on a daily basis. Project Location: 1 Cyclotron Rd., Berkeley, CA 94720 All bidding subcontractors and suppliers on this project are subject to prequalification. Project Overview C. Overaa & Co. is the Construction Manager/General Contractor (CM/GC) for Lawrence Berkeley National Lab (LBNL). This Project is for a New Facility at the same location as former Building 54 and for specific Transit Hub and Utility Project Scope elements collectively called Later THUP. Scope of New Facility (SSM B) and Later Transit Hub and Utilities (Later THUP) includes but is not limited to: Work to build new LEED Gold Facility with cafeteria, conference rooms, patio, medical clinic, badging office, site improvements including refurbished and new vehicle access and drop off, a new pedestrian entry plaza and related sidewalks, ramps and site stairs, new and reconfigured accessible parking spaces, and new shuttle bus shelter. Work includes but is not limited to Structural Concrete, Concrete Reinforcement, Concrete Paving, Architectural Precast, Structural Steel, Metal Fabrications, Steel Decking, Finish Carpentry, Metal Panels, Roofing, Metal Roofing, Waterproofing, Cementitious Fire Protection, Flashings, Expansion Joints, Firestopping, Joint Sealants, Insulation, Doors, Frames, & Hardware, Glazing, Skylight, Demountable Partitions, Overhead Coiling Doors, Framing & Drywall, Painting & Wallcovering, Acoustic Ceiling, Tile, Flooring, Epoxy Flooring, Entrance Mats, Concrete Polishing, Signage, Operable Walls, Specialties, Window Treatments, Loading Dock Equipment, Foodservice, Elevators, Gravity Based Chutes, HVAC, Controls, Electrical, Plumbing, Fire Protection, Fences & Gates, Landscape, Pavement Markings. PREQUALIFICATION - All bidding subcontractors and suppliers on this project are subject to prequalification. Contact: Michael Terentieff, michaelt@overaa.com WORK REQUIREMENTS - On-site personnel are subject to LBNL badging process requirements. SCHEDULE - Janitorial is scheduled to take place in early to mid 2026. SUBCONTRACT - A project specific sample subcontract which differs from the Overaa Standard Subcontract Agreement is included. By submitting a bid, bidders agree to all terms and conditions of Overaa's Subcontract Agreement; requesting any changes is grounds for bid to be determined non-responsive at Overaa's sole discretion. SMALL BUSINESS PLAN - A small Business Subcontracting Plan applies to this project. Subcontracting Goals include the following terms, abbreviations, or acronyms are used throughout this Plan and participation goals: ANC - Alaska Native Corporation HUBZone - Historically Underutilized Business Zone Small Business. 3% participation goal. SB - Small Business concern. (ALL SMALL BUSINESS CONCERNS) 50% participation goal. SDB - Small Disadvantaged Business concern. 5% participation goal VOSB - Veteran-Owned Small Business concern 3% participation goal SDVOSB - Service-Disabled Veteran-Owned Small Business concern. 3% participation goal WOSB - Women-Owned Small Business concern. 5% participation goal Disadvantaged Business participation is encouraged, feel free to contact our office should you need further assistance.

Post-Bid

Educational

Public - Federal

New Construction, Site Work

4

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
13
Bidding Soon
1,847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2024

April 1, 2025

Project location map

1 Cyclotron Rd, Berkeley, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.