BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a mixed-use development in Beaver Island, Michigan. Conceptual plans call for site work for a playground / park / athletic field.

As of July 23, 2025, this project has been cancelled. SEALED BID: Request for Proposal (RFP) for Peaine Township Parks and Recreation Project Font Lake Park ADA-Compliant Walking Ramp and Overlook Deck Replacement Peaine Township Board of Trustees Project Overview: Peaine Township seeks cost type not-to-exceed proposals from qualified contractors for the removal and replacement of a deteriorating walking ramp and deck at Font Lake Park. This project includes the removal of the current 120-foot walking ramp and 8-foot by 8-foot deck, followed by the construction of a 121-foot ADA-compliant walking deck with rails and a 10-foot by 10-foot overlook deck with benches with a scenic view of Font Lake. Project Scope of Work: 1. Demolition and Removal Safely dismantle and remove the existing 120-foot walking ramp and 8-foot by 8-foot deck. Dispose of materials in accordance with local and environmental regulations. 2. Construction of ADA-Compliant Walking Deck Build a new, ADA-compliant 121-foot long, 6-foot wide walking deck with rails. Utilize durable, weather-resistant, and low-maintenance materials suitable for outdoor, public use. Ensure the deck meets ADA accessibility standards. 3. Construction of Overlook Deck Construct a 10-foot by 10-foot overlook deck at the end of the walking deck, oriented to provide an unobstructed view of Font Lake. Include permanent benches on two sides of the deck using the same construction materials as the deck, if possible. Overlook deck design should be ADA compliant, incorporating necessary railings and safety measures for public use. 4. Site Cleanup and Restoration Following construction, clear the site of any construction debris and restore the surrounding area. All materials can be taken to the transfer station at no cost.

Project Abandoned

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

August 5, 2025

Project location map

Font Lake Rd, Beaver Island, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.