Published February 3, 2025 at 7:00 PM

Updated April 18, 2025

Site work for a mixed-use development in San Francisco, California. Completed plans call for site work for a parking garage; sidewalk / parking lot; and transportation facility.

The Wayfinding Enhancement Program Phase 2 (Program) will include design and implementation ofstatic and/or digital wayfinding at AirTrain stations, terminals, garages, and curbside environments, as well as specialized amenity products such as, but not limited to, water filling stations and liquid collection units. The Program will improve wayfinding pathways including for virtual gateways, AirTrain, roadways, parking, curbside, terminals, dining and shopping, gates, and more. The San Francisco International Airport is seeking proposals from qualified firms, teams, joint ventures, or other qualified business entities for Design-Build Services for the Wayfinding Enhancement Program Phase 2 (Program). The Program will include design and implementation of static and/or digital wayfinding at Air Train stations, terminals, garages, and curb side environments, as well as specialized amenity products such as, but not limited to, water filling stations and liquid collection units. The Program will improve wayfinding pathways including for virtual gateways, Air Train, roadways, parking, curb side, terminals, dining and shopping, gates, and more. The Program includes full design, engineering, and construction services for the implementation of several separate wayfinding and signage efforts across the Airport campus. Work will be performed in close coordination with Airport Operations and stakeholder groups, and other Airport or tenant improvement projects. Question Deadline 12/06/2024 at 5:00 PM PT All question must be submitted through Online. Question Response Deadline: December 10, 2024, 5:00pm The estimated duration of the Contract is 1,825 consecutive calendar days starting on the effective date indicated in the Notice to Proceed (NTP) with the Programming Phase to Final Completion. Refer to Document 00 54 39 (Contract Time and Liquidated Damages).

Post-Bid

Transportation Terminals

$105,000.00

Public - City

Site Work

14

34

19

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Field Samples, Mockups, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Windows, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Facility Fuel Systems, Facility Fuel Piping, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Special Exhaust Systems, Sawdust Collection Systems, Air Outlets and Inlets, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
62
Bidding Soon
2,003
All Active Projects
837
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2024

April 1, 2025

img_map_placeholder

674 W Field Rd, San Francisco, CA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Wayfinding Enhancement Program Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.