BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2025 at 7:00 PM

Updated April 18, 2025

Site work for a mixed-use development in San Francisco, California. Completed plans call for site work for a parking garage; sidewalk / parking lot; and transportation facility.

The Wayfinding Enhancement Program Phase 2 (Program) will include design and implementation ofstatic and/or digital wayfinding at AirTrain stations, terminals, garages, and curbside environments, as well as specialized amenity products such as, but not limited to, water filling stations and liquid collection units. The Program will improve wayfinding pathways including for virtual gateways, AirTrain, roadways, parking, curbside, terminals, dining and shopping, gates, and more. The San Francisco International Airport is seeking proposals from qualified firms, teams, joint ventures, or other qualified business entities for Design-Build Services for the Wayfinding Enhancement Program Phase 2 (Program). The Program will include design and implementation of static and/or digital wayfinding at Air Train stations, terminals, garages, and curb side environments, as well as specialized amenity products such as, but not limited to, water filling stations and liquid collection units. The Program will improve wayfinding pathways including for virtual gateways, Air Train, roadways, parking, curb side, terminals, dining and shopping, gates, and more. The Program includes full design, engineering, and construction services for the implementation of several separate wayfinding and signage efforts across the Airport campus. Work will be performed in close coordination with Airport Operations and stakeholder groups, and other Airport or tenant improvement projects. Question Deadline 12/06/2024 at 5:00 PM PT All question must be submitted through Online. Question Response Deadline: December 10, 2024, 5:00pm The estimated duration of the Contract is 1,825 consecutive calendar days starting on the effective date indicated in the Notice to Proceed (NTP) with the Programming Phase to Final Completion. Refer to Document 00 54 39 (Contract Time and Liquidated Damages).

Post-Bid

Transportation Terminals

$105,000.00

Public - City

Site Work

14

34

19

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
169
Bidding Soon
3,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2024

April 1, 2025

Project location map

674 W Field Rd, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.