Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.
There will be no LBE bid discounts for this contract. The Local Business Enterprise (LBE) subcontracting requirement is 10.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro LBEs, Small LBEs, and/or PUC LBEs. Approximately 40% of the total contract value will be used for purchasing large diameter valves, pipe and appurtenances. In addition, constraints such as the location of the work sites (spread across San Joaquin Valley from Tracy to Oakdale) and the construction timeframe (limited to 60-100 days during a yearly water system shut down) reduces the number of subcontractors available to perform work on the contract. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the City's Labor and Employment Code within two weeks after notification of award by the SFPUC General Manager. SFPUC invites Bidders to participate in the Social Impact Partnership (SIP) Program. A Bidder may choose to participate in this Program if its Bid is equal to or greater than $25 million. Refer to Section 00 73 40 SIP Program Requirements and Submittal Instructions. The objective of the project to improve existing San Joaquin Pipeline (SJPL) System for safe personnel entry into segments of pipelines without a system shutdown. Phases 2B & 2C focus on improvements at the crossover vaults (Pelican, Roselle, and Emery) and SJPL#4 tie-in. Phase 2B includes: a) Uprate by installing three (3) City-Furnished 72" butterfly valves; b) two (2) City-Furnished 54" Butterfly Valves (KGVs) and two (2) CityFurnished 36" Knife Gate Valves; c) Furnish and install fourteen (14) Removable Spool Pieces (RSPs) and reinforced concrete vaults, d) Furnish and install six (6) 8" KGVs, eight (8) 12" KGVs, and three (3) 24" KGVs that are manually operated, and e) Associated structural, corrosion control, electrical, and I&C work. Phase 2C includes: a) Uprate three (3) 60" Butterfly valves, b) Install six (6) RSPs and reinforced concrete vaults, c) Install six (6) manually operated 8" bypass KGV, and d) Associated structural, corrosion control, electrical, and I&C work. The work is to be performed in Stanislaus County, California. The Engineer's Estimate is $57,000,000. The City may award the contract to the responsible Bidder that submits the lowest responsive Bid. Phase 2B includes: a) Uprate by installing three (3) City-Furnished 72" butterfly valves; two (2) City-Furnished 54" Butterfly Valves(KGVs); and two (2) City Furnished 36" Knife Gate Valves; b) Furnish and install fourteen (14) Removable Spool Pieces (RSPs) and reinforced concrete vaults, c) Furnish and install six (6) 8" KGVs, eight (8) 12" KGVs, and three (3) 24" KGVs that are manually operated, and d) Associated site, structural, corrosion control, electrical, and I&C work. Phase 2C includes: a) Furnish and Install three (3) 60" Butterfly valves and Actuators, b) Furnish and Install six (6) manually operated 8" bypass KGV, c) Furnish and Install six (6) RSPs and reinforced concrete vaults, d) And associated site, structural, corrosion control, electrical, and I&C work
Bid Results
Water / Sewer
$50,296,818.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
March 17, 2025
Multiple Locations, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Dec 17 2024
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Jan 09 2025
San Francisco, CA
Bid Date: Jan 08 2025
San Francisco, CA
Bid Date: Dec 19 2024
San Francisco, CA
Bid Date: Dec 23 2024
San Francisco, CA
Bid Date: Feb 26 2025
San Francisco, CA
Bid Date: Dec 18 2024
San Francisco, CA
Bid Date: Dec 11 2024
San Francisco, CA
Bid Date: Jun 10 2020
San Francisco, CA
Bid Date: Apr 30 2025
San Francisco, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.