BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated January 29, 2025

Site work for a water / sewer project in West Warwick, Rhode Island. Completed plans call for site work for a water / sewer project.

A. This work involves the UV lining of the 42" East Natick Interceptor. B. The work shall include bypass pumping as each segment of CIPP liner is installed. C. Prior to the installation of the liner, the interceptor must be cleaned and TV'd. D. At the conclusion of the lining, the interceptor must be TV'd. Reference Number 0000368741 The successful Bidder must furnish a Performance Bond and a Labor and Material Payment Bond, in the specific formats as attached herein, both for the full value of the Bid Price, along with all required insurance certificates, within fifteen (15) calendar days after the award date in order to execute a Contract. *The Town reserves the right to waive any informalities or to reject any and all bids and to accept the proposal deemed most favorable to the Town. Question Deadline 11/28/2024

Award

Water / Sewer

$1,243,250.00

Public - City

Site Work

4

11

15

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
596
Active Projects
224
Bidding Soon
4,468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

February 3, 2025

Project location map

1 Pontiac Ave, West Warwick, RI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.