Published January 28, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Oklahoma City, Oklahoma. Completed plans call for the renovation of a educational facility.

Allows zero unit prices and labor Yes Allows negative unit prices and labor Yes Replace 2 existing chillers and pumps at Oklahoma School of Science and Math at 1141 N Lincoln Blvd OKC, OK A. Contractor shall achieve Substantial Completion of project no later than the number of days indicated on the Bid form from the date of receipt of the Notice to Proceed/WORK ORDER by Owner. B. Calendar Days required to complete work is estimated at (190) days. This time includes the lead time on major equipment items and is subject to vary based on market lead times. C. The Contractor is required take the leading role in the organizing, scheduling and coordinating all of the work for an efficient and speedy completion. Scheduling of the Work is the responsibility of the Contractor. Coordinate scheduling of the Work with the Owner's Representative and Using Agency. D. Provide sufficient labor and materials to complete the Work within the time required for each construction phase, if applicable, as well as to meet overall completion within the Contract Time. Any required overtime and similar costs to complete the project by the agreed completion date is included in the Contract Price. A. All building materials shall be new and products shall not contain asbestos or other materials known to be hazardous. Cost Estimate: $360,000 Contact Person(s) for Questions: Owner Representative: John Seright john.seright@omes.ok.gov | [405] 522-3107 Consultant: Will Davis will.davis@salasobrien.com | [405] 364-9926 Project Contact: Greg Madden Greg.madden@ossm.edu | [405] 203-6537 Bid Bond: If the bid exceeds $100,000, a cashier's check, a certified check or surety bid bond in the amount of five percent (5%) of the total bid is required. The certified or cashier's check must be delivered to the Owner's (Construction and Properties) Offices prior to the Bid Opening; other bid securities may be uploaded during the completion of online electronic bidding. Security checks will be returned to all but the three lowest bidders after the bid opening. The three lowest bid securities will be retained until the contract is awarded. The Contractor is required to have three bonds for Contracts exceeding One-hundred Thousand Dollars ($100,000.00); a. Performance Bond for 100% of the value of the Contract to insure completion of the Work. b. Defect Bond for 100% of the value of the Contract to provide correction of defects in the construction and equipment for one year after acceptance of the Work; and c. Payment Bond for 100% of the Contract to assure that the Owner is protected from the action of Subcontractors, suppliers and employees for unpaid debts of the Contractor.

Bid Results

Educational

$289,777.00

Public - State/Provincial

Renovation

8

13

10

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Commissioning
Division 08 - Openings

Division 08 - Openings

Roof Windows and Skylights, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
32
Bidding Soon
481
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

January 16, 2025

img_map_placeholder

1141 N Lincoln Blvd, Oklahoma City, OK

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

OSSM Replace Two Existing Chillers and Pumps - Oklahoma School Of Science and Math

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.