Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Demolition, site work, new construction and renovation of a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

**As of April 29, 2025, the project was awarded to Right Electric, Inc., with an awarded amount of $44,888,000.** Electrical Services - Aspinwall Pump Station, Bruecken Pump Station, and Clearwell Bypass Scope of Work PWSA is requesting bids of all the electrical work for the rehabilitation and replacement of equipment in the Aspinwall Pump Station, construction of the Clearwell Bypass, and construction of a new Bruecken Pump Station including coordination with sequence of work for other Contracts (1-General, 3-Plumbing, 4-HVAC) and all other procurement/installation/demolition work, etc., identified as Electrical Contractor's responsibility in the Contract Documents. The rehabilitation of the Aspinwall Pump Station includes, but is not limited to, installing four new horizonal split case pumps in generally the same location as the existing pumps, demolition of the existing fluoride building, garage, and orthophosphate system, construction of the new chemical building which would house the new orthophosphate and fluoride treatment system, stormwater system improvements with its associated yard piping system, and all associated piping and appurtenances associated with the work to rehab the Aspinwall Pump Station. The pumps would be replaced sequentially to maximize the station's available capacity during construction. The demolition of the existing orthophosphate and fluoride system will be executed in such a sequence without any outage of the chemicals injection to the filtered water. The improvement work of the Aspinwall Pump Station also includes converting the trade shop area to two-story open office space. The construction of the new Clearwell Bypass includes, but is not limited to, construction of a 144-inch bypass and an 84-inch bypass along the south embankment of the existing Clearwell, construction of an overflow structure and three bypass vaults, construction of connections to the existing inlet and outlet gatehouse, and all ancillary work associated with the construction of the Clearwell Bypass. The construction of the new Bruecken Pump Station includes, but is not limited to, demolition of the existing garage, construction of the new three-story pump station which will house six new vertical turbine pumping units with an integral wet well, construction of new orthophosphate building, construction of large diameter piping, valves, vaults, and all ancillary work associated with the construction of the new pump station. The question deadline has been extended to February 6, 2025 at 4:00pm.

Award

Water / Sewer

$44,888,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

782

26

246

10

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
107
Bidding Soon
1,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 20, 2025

Project location map

Multiple Locations, Pittsburgh, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.