EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Site work, new construction and addition to a mixed-use development in Oklahoma City, Oklahoma. Completed plans call for the addition of a educational facility; and for the construction of a educational facility.

Plans call for the construction of a storm shelter building addition, classrooms, & lab spaces as well as a new field house building. The Project consists of the construction of a new ICC-500 rated storm shelter building addition that includes additional classrooms and lab spaces. The project also includes a new stand alone field house building and exterior improvements.. Construction began February 2025 and is slated for completion August 2026. Bid Packages: 02.0 Demolition 03.0 Building Concrete 03.1 Concrete & Masonry Maintenance 04.0 Masonry 05.0 Structural Steel Material Supply 05.1 Structural Steel Erection 05.2 Decorative Metal Railings 06.0 Millwork 07.0 Waterproofing & Sealants 07.1 Roofing 07.2 Composite Wall Panels (Nichiha) 08.0 Doors, Frames, & Hardware 08.1 Storefront & Glazing 08.2 Overhead & Coiling Doors 09.0 Drywall, Framing, & Acoustical 09.1 Flooring 09.2 Concrete Floor Finishes 09.3 Painting 10.0 Misc. Specialties 10.1 Signage 10.2 Operable Glass Partitions 10.3 Metal Lockers 10.4 Custom Metal Canopies 12.0 Window Shades 14.0 Elevators 14.1 Wheelchair Lifts 21.0 Fire Suppression 22.0 Plumbing 23.0 HVAC 24.0 Total Mechanical (Plumbing & HVAC) 26.0 Electrical 31.0 Earthwork 32.0 Paving 32.1 Irrigation and Sodding 33.0 Site Utilities Direct all bids/inquiries to the construction manager. Question deadline 12-10-2024, Noon to construction manager. Estimate = total project construction cost estimate. Addendum #1-#3 have been issued as of 12-13-2024. Lippert Bros., Inc. has been informed by the Owner that this project will be a BIM project. Lippert Bros., Inc. will retain a BIM Consultant to take the Architectural and their consultants BIM models to develop a master BIM model. Lippert Bros., inc. will also retain the BIM Manager to consult with the structural steel, HVAC, plumbing, fire sprinkler and electrical contractors pertaining to their scope of work. These trades will need to include in their estimate that their shop drawings need to be provided in a 2D PDF format for submittal purposes, along with a 3D Revit model. The 3D models will be sent to the BIM Consultant for review to develop / find any clashes in the master Revit file. Lippert Bros., Inc. requests that these trades include in their base bid amount this BIM requirement, along with coordination meetings between the trade contractor. trade contractor's detailer, Lippert Bros., Inc. and the BIM Consultant. Lippert Bros., Inc. will hire ENGBIM, contact Sofia Gonzalez, phone: 949-359-7452 and email: sofia.gonzalez@engbim.com, if you wish to receive a quote for their services. If these trade contractors would like to another BIM Consultant on their own, then that is fine. Lippert Bros., Inc. has also been contacted Kelar Pacific, contact Michael Trinidad, phone: 858-888-3370 and email: michael.trinidad@kelarpacific.com. Below are some clarifications for the Roofing and Electrical Contractors: 1. Roofing Bid Package #7.0 - Berridge Wall/Soffit and Roof Panels are deemed equal to the basis of design. The following products have been reviewed Berridge L-Panel, Berridge Cee-Lock Panel, Berridge Reveal Series Panels, and Berridge FW-1025 and FW-12 Panels. Roofing contractors to review the basis of design requirements, such as gauge, and bid Berridge accordingly. 2. Electrical Bid Package #26.0 CM scope of work. Delete item #35 regarding the NEMA 3R 2000 Amp, pad mounted enclosed circuit breaker. 3. Electrical Bid Package #26.0 - Addendum #03 - NEW sheet ED-101 note 9 shows removal of exterior fixtures, receptacles etc. on what seems to be ½ the school. Is this the case? This was not noted on anything prior including the supplied demo sheets I did my initial take off on. Several of the areas are not in the project area. Please advise and/or clarify. ANSWER: The electrical engineer agrees that note 9 only applies to locations where the new building abuts the existing building. 4. Electrical Bid Package #26.0 - Addendum #03 - Note 10 calls for demo of light poles. This is normal but it also calls for removal of the entire raceway. Is their intent for us to dig it all up on the entire site or just remove the wire and abandon the raceway underground as is normal operating procedure? ANSWER: Also it will be acceptable to abandon the conduit for the light pole power.

Under Construction

Educational

$22,000,000.00

Public - City

Addition, New Construction, Site Work

359

34

199

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete, Tilt-Up Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Fluid-Applied Flooring, Carpeting, Tile Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Termite Control, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
31
Bidding Soon
479
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

February 17, 2025

img_map_placeholder

2801 NW 27th St, Oklahoma City, OK

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

NW Classen High School Addition - Bid Group 01

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.