Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2025 at 8:00 PM
Updated April 17, 2025
Site work for a water / sewer project in Moncks Corner, South Carolina. Completed plans call for site work for a water tank for rehabilitation.
Upgrades to six (6) existing sludge blanket contact clarifiers to achieve an overall increase in settled water capacity of 5-7 MGD. Each clarifier has two (2) separate basins and a common distribution and collection trough. Upgrades being considered include the addition of tube settlers above the present inclined plates to transform the existing Super Pulsator clarifiers to Ultra Pulsator clarifiers, installing covers or shade structure over the clarifiers to reduce algae growth, modification of the plates in the sludge concentrator trough to provide proper sludge removal from under the plates based on the Ultra Pulsator operational requirements, additional piping to interconnect all settled water troughs for even flow distribution to the filters across all treatment trains while performing filter backwashing, as well as various supplementary safety and accessibility features for improved operability and maintainability. The Offeror will be expected to provide a comprehensive evaluation of the existing clarifiers, including but not limited to structural integrity, operability and maintainability - including workplace safety, ventilation, lighting, etc., mechanical and electrical systems, etc., for consideration in the scope of the Project.Construction of one (1), new 5 MG Clearwell with permanent concrete baffles (not curtain walls). Construction of one (1), new surge tank and valve vault structure adjacent to the existing high service pump station #2. The Offeror will be expected to provide full range of professional and construction services typically associated with a project of this type including, but not limited to: preliminary evaluation and engineering, permitting, design, regulatory approvals, certifications, construction, commissioning and closeout. The total budget for the Scope of Work referenced is currently estimated at $20-25 million dollars. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. RFPs shall be addressed and delivered to the Owner's Representative: Payton Browder, payton.browder@santeecooper.com Question Deadline 03/21/2025 Email to Payton Browder, payton.browder@santeecooper.com
Post-Bid
Water / Sewer
$25,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
June 16, 2025
To Be Determined, Moncks Corner, SC
Related To This Project
Moncks Corner, SC
--
Moncks Corner, SC
Bid Date: Dec 10 2024
Moncks Corner, SC
Bid Date: Mar 06 2025
Moncks Corner, SC
Bid Date: Jan 14 2025
Moncks Corner, SC
Bid Date: Jan 24 2025
Moncks Corner, SC
--
Moncks Corner, SC
Bid Date: Feb 06 2025
Moncks Corner, SC
Bid Date: Mar 11 2025
Moncks Corner, SC
Bid Date: Dec 19 2024
Moncks Corner, SC
Bid Date: May 05 2021
Moncks Corner, SC
Bid Date: Dec 06 2024
Moncks Corner, SC
Bid Date: Dec 03 2024
Moncks Corner, SC
Bid Date: Nov 26 2024
Moncks Corner, SC
--
Moncks Corner, SC
Bid Date: Oct 22 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
