Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 17, 2024 at 7:00 PM

Updated December 18, 2024

Site work and paving for a mixed-use development in Waukon, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

4th Avenue NW Addition Est. Value: $ 532,540.00 Description: The construction of 4th Avenue NW from 9th Street NW (Iowa 76) east approximately 570 feet with a concrete intersection and asphalt street with concrete curb and gutter and concrete sidewalk. Work also includes the installation of subdrain, water and sewer services and storm sewer in the City of Waukon, Iowa. Contractor shall fully complete Stage 1 in 55 working days with a Late Start Date of March 31, 2025. Contractor shall fully complete Stage 2 between September 29 and October 31, 2025. Document notes There is a one hundred-dollar ($100.00) deposit for hard copies of the plans and specifications, which will be refunded if returned to the Engineer in reusable condition within fourteen (14) days of the award of the Contract. Download delivery fee is $0.00, file size is 9 MB . Performance, Payment, and Maintenance Bond. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price.

Award

Sidewalks / Parking Lot

$385,760.00

Public - City

Paving, Site Work

15

5

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
25
Bidding Soon
609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

Project location map

4th Ave NW, Waukon, IA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed