BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated July 1, 2025

This is a service / maintenance or supply contract in Shaw AFB, South Carolina. Contact the soliciting agency for additional information.

This project will demolish and replace the entrance canopy of building B922 at Shaw AFB. The work includes demolition of the existing canopy, facade, and landscaping; construction of a new canopy, supporting foundation, metal facade, and handrails; installation of LED lighting; and construction of an accessible ramp with a retaining wall and lighting. Project Title: B922 Canopy Repair Project Location: Shaw AFB Project Title: Repair Entrance B922 (VLSB 24-0060) Project Location: Shaw AFB, SC, Building B922 THIS IS A GOVERNMENT REQUIREMENT Shaw AFB requires the demolition and reconstruction of the entrance to Building B922, including a new canopy, facade, and accessible ramp. The selected contractor will provide all labor, materials, equipment, and services necessary for the complete demolition and construction, adhering to the provided SOW and a design-build approach for the canopy and ramp. Project Magnitude: The estimated magnitude of this project is between $250,000 and $500,000. Site Visit: [29 May 25 at 10:00 A.M. Eastern Daylight Time] at Building 922 parking lot [487 Myers St, Shaw AFB, SC 29152] Questions Due Date: [5 June 25 at 2:00 P.M. Eastern Daylight Time] Submit questions in writing to both the Contracting Officer and Contract Specialist. Contracting Officer: 2Lt Cary, Mallory // mallory.cary@us.af.mil Contract Specialist: TSgt Cooke, Gregory // gregory.cooke@us.af.mil Offer Due Date: [30 June 25 at 12:00 P.M. Eastern Daylight Time] Electronic bids only, submitted through SAM.gov. Bid Opening: [1 July 25 at 10:00 A.M. Eastern Daylight Time], at [321 Cullen St., Shaw AFB 29152, Building 216, conf room]. Attendance options: In-person (base access required - see attachments) or via teleconference (invitation provided after bid submission deadline). Important Notes: Bidders are responsible for reviewing all attachments and the complete Statement of Work (attached). All work must adhere to Shaw AFB Design and Construction Standards, relevant codes, Unified Facilities Criteria (UFCs), and manufacturer specifications. A one-year warranty against defects in materials and workmanship is required. The contractor is responsible for all permits. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Clubhouse / Community Centers

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
4
Bidding Soon
690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

July 9, 2025

Project location map

487 Myers St, Shaw AFB, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.