Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2025 at 8:00 PM
Updated July 1, 2025
This is a service / maintenance or supply contract in Shaw AFB, South Carolina. Contact the soliciting agency for additional information.
This project will demolish and replace the entrance canopy of building B922 at Shaw AFB. The work includes demolition of the existing canopy, facade, and landscaping; construction of a new canopy, supporting foundation, metal facade, and handrails; installation of LED lighting; and construction of an accessible ramp with a retaining wall and lighting. Project Title: B922 Canopy Repair Project Location: Shaw AFB Project Title: Repair Entrance B922 (VLSB 24-0060) Project Location: Shaw AFB, SC, Building B922 THIS IS A GOVERNMENT REQUIREMENT Shaw AFB requires the demolition and reconstruction of the entrance to Building B922, including a new canopy, facade, and accessible ramp. The selected contractor will provide all labor, materials, equipment, and services necessary for the complete demolition and construction, adhering to the provided SOW and a design-build approach for the canopy and ramp. Project Magnitude: The estimated magnitude of this project is between $250,000 and $500,000. Site Visit: [29 May 25 at 10:00 A.M. Eastern Daylight Time] at Building 922 parking lot [487 Myers St, Shaw AFB, SC 29152] Questions Due Date: [5 June 25 at 2:00 P.M. Eastern Daylight Time] Submit questions in writing to both the Contracting Officer and Contract Specialist. Contracting Officer: 2Lt Cary, Mallory // mallory.cary@us.af.mil Contract Specialist: TSgt Cooke, Gregory // gregory.cooke@us.af.mil Offer Due Date: [30 June 25 at 12:00 P.M. Eastern Daylight Time] Electronic bids only, submitted through SAM.gov. Bid Opening: [1 July 25 at 10:00 A.M. Eastern Daylight Time], at [321 Cullen St., Shaw AFB 29152, Building 216, conf room]. Attendance options: In-person (base access required - see attachments) or via teleconference (invitation provided after bid submission deadline). Important Notes: Bidders are responsible for reviewing all attachments and the complete Statement of Work (attached). All work must adhere to Shaw AFB Design and Construction Standards, relevant codes, Unified Facilities Criteria (UFCs), and manufacturer specifications. A one-year warranty against defects in materials and workmanship is required. The contractor is responsible for all permits. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Clubhouse / Community Centers
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
July 9, 2025
487 Myers St, Shaw AFB, SC
Related To This Project
Shaw AFB, SC
Bid Date: Apr 14 2025
Shaw AFB, SC
--
Shaw AFB, SC
--
Shaw AFB, SC
Bid Date: Feb 17 2026
Shaw AFB, SC
Bid Date: Jan 23 2026
Shaw AFB, SC
Bid Date: Feb 18 2026
Shaw AFB, SC
Bid Date: Mar 25 2026
Shaw AFB, SC
Bid Date: May 04 2026
Shaw AFB, SC
--
Shaw AFB, SC
Bid Date: Sep 18 2024
Shaw AFB, SC
Bid Date: Aug 08 2024
Shaw AFB, SC
Bid Date: Aug 14 2024
Shaw AFB, SC
Bid Date: Jan 06 2025
Shaw AFB, SC
Bid Date: Sep 13 2024
Shaw AFB, SC
Bid Date: Jun 29 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
