BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Demolition, site work, paving and new construction of a civil project in Richhill Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

This project includes the replacement of two structures, Greene County Bridge No. 73 carrying (T-629) over Bates Fork in Morris Township, and Greene County Bridge No. 75 carrying (T-479) over Browns Creek in Morris Township. Work will consist of replacing Bridge No. 73 with a single span prestressed concrete spread box beam bridge on integral abutments, and replacing Bridge No. 75 with a single span steel plate girder bridge on integral abutments. Each bridge will include full depth approach roadway work on the approaches of the bridges, new signing and pavement markings, upgraded guide rail, mill and overlay, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Greene County Bridges Nos. 73 and 75, Sections G73 and G75, in Greene County, Morris Township. DBE: 6% Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 59.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Greene County Bridges #73 & #75 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,841,008.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

118

11

41

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
134
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

March 1, 2025

Project location map

Multiple Locations, Richhill Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.