BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 21, 2025

Site work, paving and new construction of a mixed-use development in Box Elder, South Dakota. Completed plans call for the construction of a one-story above grade military facility; for site work for a military facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Amendment 0001: The purpose of this amendment is as follows:1. Site Visit Roster (see attachment)All other terms and conditions remain unchanged. This project will a new single-story maintenance (MX) battery storage facility at Ellsworth AFB, SD. Structure will consist of strip footings, concrete or masonry walls, steel or concrete roof framing. Interior partitions will be concrete, masonry, and/or metal stud with gypsum board. Facility will include approximately 500-750 SF of lithium-ion battery storage and charging space. Building will be minimally occupied and will be specifically for battery storage. Installation of associated site features, paving, and utilities may be required. RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.THIS IS A TOTAL SMALL BUSINESS .Contract Specialist: Sarah Martin, sarah.a.martinusace.army.mil Contracting Officer: Brittany Gull, brittany.c.gullusace.army.mil Project No. 251496

Post-Bid

Military

$5,000,000.00

Public - Federal

New Construction, Paving, Site Work

70

31

20

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 22, 2025

Project location map

To Be Determined, Box Elder, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.