Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 6, 2025 at 7:00 PM
Updated October 1, 2024
Site work for a playground / park / athletic field in Ambler, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.
**As of February 6, 2025,project for Plumbing Construction. bids received were rejected.No definite date for the rebid. **As of February 6, 2025, Electrical Construction project was awarded to MECO Constructors, Inc. , awarded amount is $310,000. **As of February 6, 2025, General Construction project was awarded to MECO Constructors, Inc. , awarded amount is $2,294,000. Bids for the construction of the three prime contracts of General Construction, Electrical Construction and Plumbing Construction Instructions to Bidders. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10% of the maximum bid price. All questions about the meaning or intent of the Bidding Documents are to be via Penn BID in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable and shall not be considered or answered. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This project is funded in part by the Redevelopment Assistance Capital Program (RACP)a Commonwealth grant program administered by the Office of the Budget for the design, acquisition, and construction of regional economic, cultural, civic, recreational, and historical improvement projects. The RACP project title is Wissahickon Park &Wissahickon Valley Boys &Girls Club, Please note that the project bid no longer involves improvements for the Boys and Girls Club. The contractor is responsible for understanding and confirming to the RACP Key Compliance Guidelines. Similarly, the successful bidder shall in no manner discriminate against or intimidate any employee involved in the manufacture of supplies, the performance of work, or any other activity required under the contract on account of gender, race, creed, or color. Question Deadline Jan 06, 2025 at 4:00 PM The Work of Project is defined by the Contract Documents and consists of the following: Project generally includes but is not limited to Construction of asphalt access drive and parking with concrete curbing, playgrounds area curbing, playground area stone base/underdrains, concrete plazas, athletic surface basketball courts, asphalt walking trail, above ground and subsurface stormwater facilities, plantings and site amenities such as benches, and signage; site Electrical Contractor work; and site plumbing contractor work. ,All details and specifications for the proposed park improvements are provided on the plan set (cover sheet and 101 sheets) dated 11-12-2024 1. All work to be completed in accordance with the Wissahickon Park Project Construction Activities Ambler, Pennsylvania - Site Safety And Health Plan is included in the Contract Requirements provide in the contract requirements. B. Type of Contract: 1. Project will be constructed under a single prime contractUse of Site: Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Limits: Confine construction operations areas where work is being completed. 2. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areasfor parking orstorage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storageof materials and equipment on-site. SC-19107.00 Bid Results : Electrical Hyde Electric Corporation $ 514,765.0 General Scott Building $147,725 Plumbing Unity Surfacing Systems $266,776
Award
Playgrounds / Parks / Athletic Fields
$2,898,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2025
February 21, 2025
40 W Mt Pleasant Ave, Ambler, PA
Related To This Project
Ambler, PA
Bid Date: Feb 06 2025
Ambler, PA
Bid Date: Feb 06 2025
Ambler, PA
Bid Date: Feb 26 2025
Ambler, PA
Bid Date: Feb 12 2025
Ambler, PA
Bid Date: Nov 13 2024
Ambler, PA
Bid Date: Dec 04 2024
Ambler, PA
Bid Date: Sep 18 2024
Ambler, PA
--
Ambler, PA
Bid Date: Jul 09 2024
Ambler, PA
Bid Date: Jun 24 2024
Ambler, PA
Bid Date: May 06 2024
Ambler, PA
Bid Date: May 23 2024
Ambler, PA
Bid Date: Apr 12 2024
Ambler, PA
Bid Date: Feb 09 2024
Ambler, PA
Bid Date: Dec 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.