BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Demolition, site work and asbestos abatement for a residential development in Spartanburg, South Carolina. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

The City of Spartanburg is requesting proposals to demolish residential structure(s) in the City of Spartanburg, at Four (4) locations - Spartanburg, SC. The City of Spartanburg hereby notifies all proposers that it will affirmatively ensure that all disadvantaged and women's business enterprises will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of gender, race, color, or national origin in consideration for an award. The City of Spartanburg reserves the right to reject any or all proposals or to waive any informality in the qualifications process. Proposals may be held by the City of Spartanburg for a period not to exceed sixty (60) days from the date of the opening of Proposals for the purpose of reviewing the Proposals and investigating the qualifications of prospective parties, prior to awarding of the Contract. The vendor that is awarded the proposal will be required to obtain a City of Spartanburg Business License. Technical questions regarding the scope of services should be directed to Martin Livingston at the City of Spartanburg at 864-580-5323 or by email at mlivingston@cityofspartanburg.org. Bid Results S Converse St - Black Grading - $9691 Branyon St - Wilma's Pump - $14490 White Oak - Black Grading - $10900 Farley - Black Grading - $7500 Measure all dimensions and number of stories including all basements, out buildings and garages. Use Safe Work Practices to tear down, demolish, raze, remove, and cart away all materials to appropriate dumping facility comprising of said building(s) components, to ground level or basement level, if said building(s) has a basement, including all concrete slabs, floors, basement walls, foundations, footings, and sidewalks, steps, patios and driveways, etc. to leave only ground and soil on the site. MOST RETAINING WALLS WILL REMAIN UNLESS OTHERWISE SPECIFIED AT THE PRE-BID OR IN THE SCOPE OF WORK. Remove all debris of whatever charter arising from the demolition of the building(s) including all contents, demolition debris, debris in the yard, out buildings and haul away to leave the entire premises cleaned to ground level and seed and straw. The contractor is required to clear the entire lot of all undergrowth, small trees, damaged trees, and dead trees. Standing healthy trees will not be removed unless specified. When removing trees, the Contractor is required to remove tree stumps and fill in depression with dirt or grind the stump below grade. Clear fence lines, poles, or hedgerows that joins property line. The Contractor must furnish everything to complete the work including but not limited to, all equipment, trucks, tractors and related equipment and materials, labor, Insurance and Workers Compensation and all DHEC Permits and City and State Permits and State and License to complete the work. Fill all crawl spaces or basements or septic tanks holes with compactable red clay. Existing dirt on a lot may be used to level the lot if it does not cause erosion, depressions, or other drainage problems Custom bid result 341 Brown Ave. Wilma's Pump - $9000 717 crescent Ave. Wilma's Pump - $10700 558 Saxon Ave. Kevin Corley - $19380 818 Fulton Wilma's Pump - $13000

Bid Results

Residential Subdivision

$52,080.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
80
Bidding Soon
1,580
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

Multiple Locations, Spartanburg, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.