BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a golf course in Tucson, Arizona. Completed plans call for site work for a golf course.

Reference Number 0000368659 Arthur Pack Regional Park currently uses potable water from multiple sources. Potable water sources within the park supply potable water to the irrigation system, potable water fixtures (hose bibs and fountains), and the facilities and restaurant for Crooked Tree Golf course. This project will focus on rebuilding the irrigation system to operate using reclaimed water provided by the City of Tucson. The supply line for reclaimed water has two points of connection. One connection point is not developed - it is currently a six-inch stub off a main service line located within Thornydale Road. The irrigation system will be fully replaced with components suitable for reclaimed water. The work will also include replacing distribution lines, valves and control/management systems. The final system shall operate remotely using Rain Bird's IQ control system. General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required Question Deadline 12/10/2024 at 5:00 PM MT Questions are submitted online Yes Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % -- Bids must be accompanied by an original bid guarantee of ten percent (10%) of the TOTAL BID amount. Pima County accepts the forms of bid guarantee provided in A.R.S. 34-201(A) (3). The project shall be complete and in place within 220 working days from Notice to Proceed. LICENSING: All bidders must hold a valid license issued by the of Arizona Registrar of Contractors and maintain same throughout the duration of the contract term. Failure to maintain said license may be grounds for default of the contract and subsequent termination.. Certified Disadvantaged Business Enterprise (DBE) firms are encouraged to participate, and Respondents are encouraged to maximize the use of certified DBEs where possible. Liquidated damages for late delivery will be assessed per PAG 2015 Specification Section 108-9. Estimated cost for the project is between $1,750,000.00 and $2,250,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Golf Course

$2,085,906.00

Public - County

Site Work

11

10

25

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
13
Bidding Soon
484
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

February 17, 2025

img_map_placeholder

9101 N Thornydale Rd, Tucson, AZ


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.